Similar Projects
Water System Improvements
Infrastructure
Bidding
Tillar, AR

Construction of Emergency Water Source Replacement Phase IIA
Infrastructure
Bidding
Fifty Six, AR

Water Project
Post-Bid
Less than $166,000 est. value
Nashville, AR

Water System Improvements: Contract II - Water Line Extension and Chlorination Facility
Post-Bid
El Dorado, AR

Water Quality Demonstration
Results
Less than $1,412,520 est. value
Conway, AR 72032

Raw Water Supply Transmission Pipeline Contract 5
Results
Less than $11,200 est. value
Hot Springs, AR

Highway 67 Water Line Relocation
Infrastructure
Bidding
Jacksonville, AR

Construction of the Highway 141 Water Line Relocation
Infrastructure
Post-Bid
Paragould, AR

Highway 9 Water Line Relocation
Results
Salem, AR

Wastewater System Improvements
Infrastructure
Post-Bid
Lake City, AR

Stone Links - Multi-Pipe Maintenance Rehabilitations
Infrastructure
Results
North Little Rock, AR

Highway I-49 18 Water Main Extension
Infrastructure
Post-Bid
Rogers, AR

Construction – 2021 Waterline Improvements
Infrastructure
Results
Less than $5,250,000 est. value
Fayetteville, AR

Highway 37 Utility Relocation
Infrastructure
Post-Bid
Tuckerman, AR

Benton Utilities - Exit 114 Waterline
Infrastructure
Results
Benton, AR

Reported 07/30/2021 12:00 AM
Project Title

UAM 6 Inch Waterline Replacement

Physical Address View project details and contacts
City, State (County) Monticello, AR   (Drew County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project work includes replacement of an existing 6’’ asbestos cement waterline with a new 6’’ C900 PVC pipe with Certa-Lok Fittings or 6” HDPE DR11 waterline pipe, which will be directional bored. The new waterline will also connect to an existing 3’’ and 4’’ service line. The existing 6’’ asbestos cement waterline will be cut and plugged near both ends, and will connect to the new waterline with 6’’x 6’’ tapping sleeve and gate valves.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents