Similar Projects
Market Survey DLA DSCC Water Line Renovation Project
Post-Bid
$1,000,000 to $5,000,000 est. value
Columbus, OH

Alternative Liner Pipe Material (CIPP)
Term Contract
Post-Bid

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

SWWTP - Flow Meters
Results
Columbus, OH

Jackson Pike Backflow Upgrade and Replacement Project
Infrastructure
Post-Bid
Grove City, OH

Water Meter Installation FY 2019
Results
Less than $1,600,000 est. value
Columbus, OH

IRJCF Water Valve Sqeegie
Infrastructure
Post-Bid
Columbus, OH

Vernon Road Water Main Improvements
Results
Less than $2,029,881 est. value
Bexley, OH 43209

Center Large Diameter Rehabilitation Project
Results
Columbus, OH

Mcgill Park Utility Improvements
Results
Less than $814,000 est. value
Canal Winchester, OH

2021 Mccoy Road Resurfacing and Waterline Replacement
Results
Upper Arlington, OH

Parker Valves
Results
Columbus, OH

Pratt Valve R. Miller
Results
Less than $2,200 est. value
Columbus, OH

Pressure Reducing Valves
Results
Columbus, OH

HCWP - Water Fountain - R. Miller
Results
Columbus, OH

Last Updated 04/15/2022 02:29 PM
Project Title

State Route 104 (Jackson Pike) 12" Waterline Extension & Shared-Use Path Improvements

Physical Address View project details and contacts
City, State (County) Grove City, OH 43121   (Franklin County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,570,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the installation of approximately 2,100 feet of 12-inch water main and associated appurtenances. Installation of the water main will require completion of a jack and bore of approximately 160 feet of a 24-inch steel casing pipe. In addition, the project includes construction of approximately 1,500 feet of asphalt shared-use path requiring substantial grading and embankment. A 95 foot-long long span prefabricated bridge structure is required to facilitate the connectivity of the shared-use path.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents