Similar Projects
Beaumont Pioneer Crossing / Clubhouse
New Construction, Infrastructure - 2,502 SF
Design
$450,000 CJ est. value
Lufkin, TX 75904

Beaumont Pioneer Crossing / Clubhouse
New Construction, Infrastructure - 2,502 SF
Design
$450,000 CJ est. value
Lufkin, TX 75904

Construction of Landscape Improvements for The Highlands Sundew
Infrastructure
Bidding
$400,000 CJ est. value
Palestine, TX 75803

SH 35 - Interchange Improvement (New or Update)
Infrastructure
Bidding
$27,834,761 CJ est. value
Rockport, TX 78382

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Street Improvements
Infrastructure
Results
$408,609 est. value
Lakeside City, TX

US0385-Cleaning and Sealing Cracks
Infrastructure
Results
$258,378 est. value
TX

New Water and Wastewater Lines on South Sylvan
Infrastructure
Construction
$286,155 CJ est. value
Palestine, TX 75801

Asphalt Renovation
Infrastructure
Construction
$610,000 CJ est. value
Huntington, TX 75949

Butler Park Apartments Multifamily Development
New Construction, Infrastructure - 68,841 SF
Pending Verification
$18,776,400 CJ est. value
Andrews, TX 79714

Lufkin Christian Academy New Education Building
New Construction, Infrastructure - 5,000 SF
Pending Verification
$100,000 CJ est. value
Lufkin, TX 75901

Allsup's Andrew #102437 / Allsup's Gas Station
New Construction, Infrastructure - 5,630 SF
Design
$600,000 CJ est. value
Andrews, TX 79714

FM 2680 - Hazard Elimination and Safety
Infrastructure
Bidding
$1,932,663 CJ est. value
Lufkin, TX 75904

Waste Management Center - 5 Miles South of Loop 287 on FM 58
Infrastructure
Post-Bid
TX

Last Updated 02/07/2023 03:54 PM
Project Title

Fishing Pier Replacement Fort Richardson State Historic Site

Physical Address View project details and contacts
City, State (County) Jacksboro, TX 76458   (Jack County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $293,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Questions Due 5:00 PM, December 19, 2022 General Scope of Work: All in accordance with the Request for Competitive Sealed Proposals and Contract Documents. New floating fishing pier and concrete abutment. Fishing platform approximately 25 ft x 25 ft located over approximately 20 ft deep water in the old rock quarry pit area. Shade structure with benches constructed over a portion of the 25 ft x 25 ft fishing platform. Concrete paved areas for one accessible van parking space and access aisle in the existing gravel parking lot near the fishing pier. Concrete paved accessible walkway connecting the van accessible parking space to the new fishing pier. One accessible picnic site connected to the fishing pier accessible route Demolish and remove the existing wooden fishing pier and associated abutment. Concrete paved area for one accessible van parking space and access aisle in the existing gravel parking lot near the restroom facility. Concrete paved accessible walkway connecting the accessible van parking space to the restroom facility. All work shall be completed within two hundred forty (240) calendar days commencing on the date specified in the Notice to Proceed. This performance period includes completing the various aspects required to complete the Work, including submission of all Submittals, mobilization, procurement, installation, testing, inspection, and delivery of documents described in the Uniform General Conditions, Article 12, 12.1.1.1. In order to receive the Teams(TM) calendar invitation to the pre-proposal on-line video conference, Offerors must pre-register. Following the on-line video conference, the PowerPoint(TM) presentation will be posted to the Electronic State Business Daily. Prior to the on-line video conference, TPWD will send an email calendar invitation containing information about joining the on-line video conference to each requestor. Contract Manager, Ashley Murray by 5:00 PM (CT), December 19, 2022. Ashlev.Murrav@tpwd.texas.aov Construction Estimate $ 240,000.00 to $ 293,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents