Similar Projects
Pardeeville - Manchester Const/ Mill and Overlay
Infrastructure
Conception
$3,000,000 CJ est. value
Ripon, WI 54971

Pardeeville - Manchester Const/ Mill and Overlay
Infrastructure
Conception
$3,000,000 CJ est. value
Ripon, WI 54971

USH 45, City of Fond Du Lac Ex-jt Payment 7 of 11 FY23
Infrastructure
Design
$750,000 to $1,000,000 est. value
Fond du Lac, WI

Summit Automotive Vehicle Service and Repair
New Construction, Infrastructure - 11,485 SF
Design
$2,500,000 CJ est. value
Fond du Lac, WI 54937

Fond Du Lac - Chilton, Drainage Way Culvert Replacement
Infrastructure
Post-Bid
$750,000 to $999,999 est. value
WI

2022 Road/LRIP Project Bids
Infrastructure
Post-Bid
Ripon, WI

Asphalt Paving
Infrastructure
Results
Waupun, WI 53963

Northeast Region-Wide Deck Sealing FY22, Various Backbone Routes STH
Infrastructure
Results

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Froedtert Health and ThedaCare
New Construction, Infrastructure - 18,000 SF
Pending Verification
$35,000,000 CJ est. value
Fond du Lac, WI 54935

Pardeeville - Manchester Const/ Structure Replacement
Infrastructure
Conception
$1,000,000 CJ est. value
Ripon, WI 54971

Aurora Medical Center Fond du Lac
Addition, New Construction, Infrastructure - 70,000 SF
Design
$67,000,000 CJ est. value
Fond du Lac, WI 54937

2022 Road Repair
Term Contract
Post-Bid
$300,000 est. value
Waupun, WI

2022 Utility and Street Construction
Infrastructure
Results
Fond du Lac, WI

Last Updated 07/11/2023 10:48 AM
Project Title

Construct Unit Storage Building Fond Du Lac Armory

Physical Address View project details and contacts
City, State (County) Fond du Lac, WI 54935   (Fond du Lac County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $215,900 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the erection of a metal Unit Storage Building of approximately 1620 sq. ft. from an existing steel frame stored on site and includes new metal siding, new metal roof and placed on a reinforced concrete slab with grade beam. Also included is electrical service with internal LED lighting and outlets, a new double entry door and new interior chain link fence partitions. Included is a concrete apron connecting the building to the paved driveway. In general, the work consists of: Erection of a metal Unit Storage Building of approximately 1620 sq. ft. from an existing steel frame stored on site and includes new metal siding, new metal roof and placed on a reinforced concrete slab with grade beam. Also included is electrical service with internal LED lighting and outlets, a new double entry door and new interior chain link fence partitions. Included is a concrete apron connecting the building to the paved driveway. Please note that this project is taxable. The lead time for metal buildings will likely push the start of this project into Oct/Nov.

Details

1,620 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents