Similar Projects
Last Updated | 07/09/2021 08:43 AM |
Project Title | Region 3 Roundabouts |
Physical Address | View project details and contacts |
City, State (County) | (Eagle, Garfield, Mesa, Pitkin, Summit Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Highway Signs/Guardrails/Barriers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work Shall Consist Of The Removal, Supply And Application Of Epoxy Pavement Marking And Preformed Thermoplastic Word / Symbol And Crosswalk Stencils As Designated By The Engineer And In The Tabulation Of Pavement Markings On All Roundabouts On State Highways Within Region 3 And The Diverging Diamond On Highway 70b; Highways Will Include 6d, 6e, 6k, 9c, i-70a Ramps, i-70 b, f, And g, 82a, 133a, And 340a. All Pavement Markings And Stencils Shall Be Ground To Create a Recessed Groove As Indicated In The Detailed Quantity Spreadsheet. a Small Quantity Of Contrast Stop Bar / Crosswalk Thermoplastic Will Be Required For The Roundabouts In Eagle, As Shown On The Detailed Stencil Quantity Table. 202-00250 Removal of Pavement Marking 14,000.000 SF 626-00000 Mobilization 1.000 L S 627-00008 Modified Epoxy Pavement Marking 200.000 GAL 627-30407 Preformed Thermoplastic Pavement Marking (WordSymbol) (Special) 2,200.000 SF 627-30411 Preformed Thermoplastic Pavement Marking (XwalkStop Line) (Special) 1,600.000 SF 630-00000 Flagging 300.000 HOUR 630-00012 Traffic Control Management 30.000 DAY |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |