Similar Projects
Target
Renovation
Design
Saint Louis Park, MN 55426

2021 Utility, Street and Alley Improvements - Group 1
Bidding
$3,500,000 est. value
New Ulm, MN

2021 Utility, Street and Alley Improvements - Group 1
Bidding
$3,500,000 est. value
New Ulm, MN

Century Middle School Pool Addition - Bid Package 4 - Parking Lot
Post-Bid
Lakeville, MN 55044

Sakatah Singing Hills State Trail Lime Valley Slope Failure
Post-Bid
Less than $356,970 est. value
Mankato, MN

Notch and Widen, Mill and Overlay
Results
$1,485,291 est. value
Okabena, MN 53053

Upgrades of ADA Pedestrian Ramps
Results
Minneapolis, MN 55401

City Wide Bike Lane and Laurel Avenue Mill and Overlay
Bidding
$1,350,000 est. value
Golden Valley, MN 55416

Pre-formed Expansion Joint Filler
Term Contract
Post-Bid
Minneapolis, MN

Centerline Culvert Replacement with Culvert, Approach Grading, Aggregate Base, Bituminous Paving, Aggregate Shouldering and Striping
Results
$296,335 est. value
MN

2021 Seal Coat
Bidding
Crosby, Cross Lake, Deerwood, Fifty Lakes, MN

PAMS Cure Compound
Term Contract
Post-Bid
Minneapolis, MN

Bituminous Milling and Surfacing, Ultrathin Bonded Wearing Course, and ADA Improvements
Results
MN

5th Street SW Reconstruction
Bidding
Grand Rapids, MN

Glenwood Grade Separation
Renovation
Post-Bid
Minneapolis, MN

Last Updated 02/11/2021 02:00 AM
Project Title

2021 Neighborhood Improvement

Physical Address View project details and contacts
City, State (County) Albert Lea, MN   (Freeborn County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 to $700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, material, and equipment to install the following estimated quantities: 3,044 SY Bituminous Edge Milling 1,392 SY Remove Bituminous Surface 3,363 Ton Bituminous Paving 2,919 Gal Bituminous Tack 489 LF Concrete Curb & Gutter

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents