Similar Projects
Arapeen Connector Pathway
Infrastructure
Bidding
$465,000 est. value
Salt Lake City, UT

CDBG Sidewalk Construction Project
Infrastructure
Bidding
Taylorsville, UT

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Parleys Way Crosswalk Enhancements and Pedestrian Safety Improvements
Post-Bid
Salt Lake City, UT 84114

Holladay Safe Routes to School Safe Routes to Schools/Pedestrian/Bicycle Safety
Results
Less than $500,000 est. value
UT

SR-85; MP 3.52-20.84, Various Improvements HSIP - Highway Safety Improvement/Intersection Improvement
Results
$1,500,000 to $3,000,000 est. value
UT

Quarry Bend Park - Sidewalk and Retaining Wall
Post-Bid
Sandy, UT 84070

Central Foothill Trail System Construction and Wayfinding
Results
Less than $250,000 est. value
Salt Lake City, UT

6000 West Pre-Cast Fence and Sidewalk
Post-Bid
Herriman, UT 84096

2020 Murray City Concrete Repair
Results
Less than $977,030 est. value
Murray, UT 84107

SLC Airport Parking Lot E Pedestrian Canopy
Post-Bid
Salt Lake City, UT 84122

Improvements to Parking Lot 10
Results
Less than $95,000 est. value
Salt Lake City, UT 84112

Slc Airport Aoc Vehicle Canopy
Post-Bid
Salt Lake City, UT 84122

Terra Linda Parking Lot Enhancement
Results
West Jordan, UT 84088

Station 115 Parking Lot Concrete Repair
Post-Bid
UT 84006

Last Updated 06/11/2021 01:52 PM
Project Title

SLC Airport North Cargo Parking Lot Expansion

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $326,689
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A new parking lot will be constructed directly east of the DHL Cargo Building at the Salt Lake City International Airport. This lot will be configured to provide approximately 105 additional stalls. Work will include saw cutting, excavation, import of engineered fill, and asphalt paving. Also included is lighting, drainage and pavement markings.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents