Similar Projects
Michigan Avenue 12th to 15th Roadway Reconstruction and Sewer Work
Bidding
$650,000 est. value
South Milwaukee, WI 53172

DC0101 Gate Replacements
Bidding
Milwaukee, WI 53221

On-Call Construction Services for Sewer Repair and Rehabilitation
Term Contract
Post-Bid
Milwaukee, WI

Combined Sewer Overflow (CSO) 195 Relocation
Renovation
Post-Bid
Milwaukee, WI

Sanitary and Storm Relays
Results
West Allis, WI 53214

2020 Brown Deer Mainline Sanitary Sewer CIPP Lining
Results
Less than $662,000 est. value
Milwaukee, WI 53223

2021 Sanitary Sewer Rehabilitation Program
Post-Bid
Oak Creek, WI

Sanitary Sewer Main Relay
Renovation
Results
$359,000 est. value
Milwaukee, WI

DPW Sewer and Water Mains
Post-Bid
Milwaukee, WI 53288

Sanitary Sewer Connection Liners
Results
Less than $174,625 est. value
West Allis, WI 53214

Sewer Construction
Post-Bid
Milwaukee, WI

Access Hatch Replacement Phase 6
Results
Milwaukee, WI

Combined Sewer Main Relay & Combined Sewer Lining and Manhole Repair & Lining
Post-Bid
Milwaukee, WI

CSO 102 Rehabilitation - Humboldt
Results
Milwaukee, WI

2020 Sanitary Sewer Rehabilitation at Multiple Locations - Clean and CCTV Sewer Lines
Results
Milwaukee, WI

Last Updated 02/11/2021 04:51 AM
Project Title

2021 Sanitary Sewer Lining

Physical Address View project details and contacts
City, State (County) Shorewood, WI   (Milwaukee County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The sanitary sewer lining will consist of approximately 275 feet of 12-inch RCP or vitrified clay pipe, 675 feet of 12-inch-wide by 18-inch-high horizontal elliptical RCP, 140 feet of 12-inch-wide by 18-inch-high horizontal elliptical RCP installed in a curved radius, 390 feet of 12-inch-wide by 24-inch-high horizontal elliptical RCP, and 400 feet of 15-inch-wide by 24-inch-high horizontal elliptical RCP. To complete the sanitary sewer lateral rehabilitation, the Contractor is required to clean the sewers prior to lining and televise the sewers after lining. Contractor shall provide all required traffic control. Work is planned on State Highway 190, “East Capital Drive” and only one lane of traffic shall be closed during lining work.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents