Similar Projects
Amarillo ISD Bond Project
New Construction, Renovation
Conception
Amarillo, TX

Hines Memorial Park Playground Equipment Replacement
Renovation, Infrastructure
Design
$4,000 est. value
Amarillo, TX 79107

Microtel Amarillo / Microtel Hotel
New Construction, Infrastructure - 36,178 SF
Design
$3,620,000 CJ est. value
Amarillo, TX 79124

SL 335 - Construct Frontage Roads
Infrastructure
Bidding
$102,940,702 CJ est. value
Amarillo, TX 79108

SL 335 - Construct Frontage Roads
Infrastructure
Bidding
$102,940,702 CJ est. value
Amarillo, TX 79108

Dollar Tree - River Road / Amarillo (Shell)
New Construction, Infrastructure - 10,548 SF
Sub-Bidding
$1,500,000 CJ est. value
Amarillo, TX 79107

Take 5 Oil Change / Amarillo
New Construction, Infrastructure - 1,415 SF
Post-Bid
$400,000 CJ est. value
Amarillo, TX 79109

Take 5 Oil Change / Amarillo
New Construction, Infrastructure - 1,415 SF
Post-Bid
$400,000 CJ est. value
Amarillo, TX 79109

Road Rehabilitation for Western Street, Wallace Boulevard, Hagy Boulevard and Port Lane
Infrastructure
Results
$11,708,500 est. value
Amarillo, TX 79108

VA - Highway Improvement
Infrastructure
Results
$6,061,308 est. value
TX

2022 Renovations For Fillmore Lofts
Infrastructure, Renovation - 12,000 SF
Construction
$100,000 CJ est. value
Amarillo, TX 79101

2022 Renovations For Fillmore Lofts
Infrastructure, Renovation - 12,000 SF
Construction
$100,000 CJ est. value
Amarillo, TX 79101

Kohls Sephora Renovation #748 / Amarillo
Demolition, Renovation, Infrastructure - 2,500 SF
Pending Verification
$300,000 CJ est. value
Amarillo, TX 79124

Astoria Park Apartments - Rehabilitation
New Construction, Infrastructure
Pending Verification
$84,060,000 CJ est. value
Amarillo, TX 79102

Encompass Health Amarillo IRF / Encompass Health Rehabilitation Hospital of Amarillo
New Construction, Infrastructure
Design
$27,920,636 CJ est. value
Amarillo, TX 79106

Last Updated 11/22/2022 08:05 AM
Project Title

Tradewind Square Elementary School - Amarillo Independent School District

Physical Address View project details and contacts
City, State (County) Amarillo, TX 79107   (Potter County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2021
Bids Due View project details and contacts
Estimated Value $12,979,647 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The new elementary school is anticipated to be located near the Tradewind Square subdivision, west of Tradewind Street and south of East 46th Avenue. As of June 2021, this project is on hold indefinitely. Information regarding a timeline for bidding and construction is not currently known.

Details

74,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents