Similar Projects
Corsican Apartments Boiler Replacement
Renovation
Design
$5,000,000 CJ est. value
Denver, CO 80206

Replacement of Two Boilers and Commissioning Services
Renovation
Sub-Bidding
$215,000 CJ est. value
Denver, CO 80203

USAFA Fy22 Grease Laden Duct Cleaning Service
Term Contract
Post-Bid

Clear Creek HVAC Remodel Project
Alteration
Post-Bid
Denver, CO 80204

CU Denver PN20-112394 - SCPP Only
Alteration
Results
$125,000 est. value
Denver, CO 80204

Annual Building Chiller Maintenance
Alteration
Results
Denver, CO 80203

Grant Ranch Chiller Replacement
Renovation
Construction
$500,000 CJ est. value
Littleton, CO 80123

Greenwood Chiller Replacement
Renovation
Construction
$300,000 CJ est. value
Denver, CO 80239

Replace HVAC System #49 Replace Water Soft #118
Alteration
Post-Bid

Replace Cooling Unit in Elevator Room
Alteration
Results
Less than $50,000 est. value
Denver, CO 80203

Evie Dennis Heat Pump Replacement
Renovation
Post-Bid
$300,000 CJ est. value
Denver, CO 80249

Smiley Mechanical Cooling
Alteration
Results
Denver, CO 80207

Air Duct Cleaning for Denver Fire Department
Term Contract
Post-Bid
Denver, CO 80206

HVAC Replacement in Four Buildings and Emergency Suicide Mitigation
Alteration
Results
Denver, CO

Recreation Centers - HVAC Equipment Upgrades
Renovation
Post-Bid
$200,000 CJ est. value
Denver, CO 80202

Last Updated 02/27/2023 05:05 PM
Project Title

Replace King Center HVAC Systems - Flat Plate Heat Exchanger

Physical Address View project details and contacts
City, State (County) Denver, CO 80202   (Denver County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $40,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This Documented Quote is to provide materials and labor to clean and re-gasket two (2) flat plate heat exchangers on site at the AHEC campus, one Accu-Therm brand heat-exchanger in the King Center and the second Alpha Laval brand heat exchanger in the Tivoli Student Union Building. As an attachment to the Documented Quote form, firms must list each building and the lump sum cost for labor and materials for each (as separate line items). Costs will be listed separately for each building on the issued Purchase Order and should be billed separately. Ideally, the work will happen concurrently, so contractor must be prepared to staff both projects. Itemized details for each heat exchanger are listed below Estimated Construction Cost: $40,000 (King Center) & $50,000 (Tivoli) This Documented Quote is to provide materials and labor to clean and re-gasket two (2) flat plate heat exchangers on site at the AHEC campus, one Accu-Therm brand heat-exchanger in the King Center and the second Alpha Laval brand heat exchanger in the Tivoli Student Union Building. As an attachment to the Documented Quote form, firms must list each building and the lump sum cost for labor and materials for each (as separate line items). Costs will be listed separately for each building on the issued Purchase Order and should be billed separately. Ideally, the work will happen concurrently, so contractor must be prepared to staff both projects. Itemized details for each heat exchanger are listed below. Date Email Questions Due February 10, 2023 at 5:00PM Date Email Answers Issued February 15, 2023 at 5:00PM

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents