Similar Projects
Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

Vineyard Avenue Pavement Rehabilitation: I-10 Freeway to Holt Boulevard - City of Ontario
Infrastructure
Conception
$445,000 CJ est. value
Rancho Cucamonga, CA 91730

North System North Trunk (NSNT) Sewer Siphon Replacement
Infrastructure
Design
$2,000,000 CJ est. value
Chino, CA 91710

Redlands Mall Development
New Construction, Renovation - 84,106 SF
Design
$275,000,000 est. value
Redlands, CA 92373

Starbucks / San Bernardino
New Construction, Infrastructure - 1,001 SF
Bidding
$750,000 CJ est. value
Highland, CA 92346

Construction of Simulation Center
New Construction, Infrastructure - 70,000 SF
Bidding
$100,000,000 CJ est. value
Fort Irwin, CA 92310

O'Reilly Auto Parts #2 / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

Storm Drain Improvements
Infrastructure
Post-Bid
Chino, CA 91709

Joslyn Senior Center Renovation
Renovation, Infrastructure
Results
$1,033,800 CJ est. value
Redlands, CA 92373

Stanfield Cutoff Restroom Site Preparations Project
Infrastructure
Results
$300,000 est. value
Big Bear Lake, CA

San Bernardino County Transportation Tunnel
New Construction, Infrastructure
Pending Verification
$492,000,000 CJ est. value
Rancho Cucamonga, CA 91730

East Davidson Street Town Homes
New Construction, Infrastructure - 807 SF
Pending Verification
$5,000,000 CJ est. value
San Bernardino, CA 92408

Wineville Avenue Pavement Rehabilitation: Philadelphia Street to Francis Street - City of Ontario
Infrastructure
Conception
$320,000 CJ est. value
Ontario, CA 91764

Starbucks and Burger King #4974 / Barstow
Demolition, New Construction, Infrastructure - 5,550 SF
Design
$1,700,000 CJ est. value
Barstow, CA 92311

Runway 26R ILS Upgrade Project at Ontario Internatonal Airport
Infrastructure
Bidding
$3,250,000 CJ est. value
Ontario, CA 91761

Last Updated 08/15/2022 01:32 PM
Project Title

City Creek Road Guard Rail Replacement

Physical Address View project details and contacts
City, State (County) San Bernardino, CA 92346   (San Bernardino County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Maintenance, Site Development, Steel
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

City Creek Guard Rail Replacement Project Location: The project is located on the south side of City Creek Road from State Highway 18 heading west for approximately 450-feet in the community of Running Springs, San Bernardino County, California (see attached Location Map). Project Description: The Proposed Project consist of removing and replacing the Metal Beam Guardrail along the south side of City Creek Road, installing Midwest Guardrail System and End Terminals, guard railing delineators with snow poles and road signs, slurry cement backfill, and minor grading. Equipment planned for this project will included but is not limited to: Concrete Mixer, Backhoe, Auger, Loader Truck (for removed railings, asphalt concrete or debris No traffic detours or nighttime construction are planned. No relocation of utilities is anticipated. Construction activities will occur on or adjacent to existing roads, asphalt or graded and maintained dirt shoulder. Construction duration is anticipated for approximately 10 working-days. LENGTH: 400 LF WORK ORDER: H15046 AREA: Running Springs ROAD NO.: 240900-020

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents