Similar Projects
Indefinite Delivery Contract - Roofing Services
Post-Bid
Charleston, SC 29401

TOC - Roofing Construction Services
Post-Bid
Isle of Palms, SC

Admin Roof Replacement - John de la Howe School
Results
$400,000 to $500,000 est. value
McCormick, SC 29835

Reroofing Construction Project - SCGSAH
Results
$400,000 to $550,000 est. value
Greenville, SC 29601

Roofing/HVAC Replacement - Richland Northeast High School
Post-Bid
Columbia, SC 29223

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Logistics Center Roof
Post-Bid
$30,000 to $60,000 est. value
Columbia, SC 29223

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roofing Envelope Services
Post-Bid

Roof Repairs to the Bailey Municipal Center
Results
$58,000 est. value
Clinton, SC 29325

Selective Roof Repairs at West Pelzer Elementary School and Palmetto High School
Results
Pelzer, Williamston, SC 29669

SCDDSN Whitten Center - Buildings 104 and 110 - Roof Replacement
Results
Less than $70,000 est. value
Clinton, SC 29325

Art Annex Roof Replacement
Results
$289,950 est. value
Greenwood, SC 29649

Spartanburg - Tyger River 86 Warehouse Reroofing Phase II
Results
$124,900 est. value
Duncan, SC 29349

Main Campus Roofing and Building Envelope Waterproofing Building 920
Results
$185,000 to $205,000 est. value
North Charleston, SC

Reported 10/28/2021 12:00 AM
Project Title

Abbeville Civic Center Roof Retrofit

Physical Address View project details and contacts
City, State (County) Abbeville, SC   (Abbeville County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of the Abbeville Civic Center Roof. Retro-Fit System over the existing Civic Center Metal Roof as described below: 1. Provide all safety measure per OSHA guidelines. 2. Install pressure treated wood blocking around. 3. Install proper EPS flue filler per metal panels 4. Install overlay board and gang screw with flue filler. 5. Install fully adhered 60 mil TPO roofing system per manufacturer’s instruction. 6. Flash all adjoining walls, rtu’s, fans, etc. per manufacturer’s instructions. 7. Fabricate and install new guttering, downspouts and perimeter edge flashings utilizing a 24 gauge galvalume with kynar 500 finish, color by owner from standard color choice. 8. Clean up and haul away all debris on daily basis. 9. Provide a two-year workmanship guarantee against any leakage. 10. Provide a twenty-year manufacturer’s warranty.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents