Similar Projects
Westgate Academy Facility - Tenant Improvements
Renovation - 17,000 SF
Post-Bid
$247,409 CJ est. value
Odon, IN 47562

The RV/MH Hall of Fame Convention Hall
New Construction - 36,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Elkhart, IN

Grand Millennium Center
New Construction, Infrastructure - 350,000 SF
Design
$200,000,000 CJ est. value
Westfield, IN 46074

Center Grove C.S.C. - Innovation Center Addition
Addition, Infrastructure - 1,200 SF
Bidding
$2,717,000 CJ est. value
Greenwood, IN 46143

Hampton Inn & Suites Hotel & Conference Center
New Construction - 71,987 SF
Construction
$13,000,000 est. value
Speedway, IN 46224

ICC Elevator and Escalator Modifications
Renovation
Post-Bid
$300,000 est. value
Indianapolis, IN 46225

Odd Fellows Building Redevelopment
Build-out - 82,565 SF
Design
$25,000,000 CJ est. value
Indianapolis, IN 46204

Victory Field - BP#100 Playing Field
Renovation
Bidding
$200,000 CJ est. value
Indianapolis, IN 46225

Monroe Convention Center Expansion
Addition, Demolition, Renovation, Infrastructure - 60,000 SF
Design
$44,000,000 CJ est. value
Bloomington, IN 47403

Memorial Opera House And Porter County Museum
Renovation
Design
$6,500,000 CJ est. value
Valparaiso, IN 46383

Event Center - Saint Mary Of The Woods College
New Construction, Infrastructure
Conception
$1,500,000 est. value
IN 47876

Commuter Lounge Renovation
Renovation
Post-Bid
$30,000 CJ est. value
Terre Haute, IN 47809

General Construction - Raper Expo Center
New Construction
Post-Bid
Richmond, IN

Last Updated 06/12/2023 03:06 PM
Project Title

Fort Wayne Community Schools 2022 GBS Grile Conference Center

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46802   (Allen County)
Category(s) Entertainment/Recreation
Sub-Category(s) Convention/Exhibit Center
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Each bid proposal shall include all labor, material and services necessary to complete the projects in strict accordance with the drawings and specifications as prepared and on file in the office of: Kelty Tappy Design, Inc. Bids shall be received from a single prime contractor. Unlocked electronic PDF sets of drawings will be available for an additional cost. Any unsuccessful bidder, upon returning such sets in good and usable condition within (10) ten days of the bid date will be refunded their deposit. There will be shipping and handling charges for the delivery of each set of Bidding Documents. Each bid shall be accompanied by a certified check, a cashier's check or a bid bond executed by a surety company which is authorized to do business in the State of Indiana, made payable to the Fort Wayne Community Schools and in an amount equal to five percent (5%) of the bid. In the event a bidder withdraws its bid or fails to execute a satisfactory contract within ten ( 10 ) days after the contract is awarded to such bidder by Fort Wayne Community Schools, Fort Wayne Community Schools may declare the certified check, cashier's check or bid bond forfeited to Fort Wayne Community Schools, as liquidated damages. A bid may not be modified, withdrawn or cancelled by the bidder for sixty (60) days following the time and date designated for the receipt of bids without the consent of Fort Wayne Community Schools. Fort Wayne Community Schools reserves the right to reject any and all bids or waive any or all informalities, irregularities and/or inconsistencies in, or with respect to, any or all bids. Performance and Labor and Material Payment Bonds in an amount equal to one hundred percent (100%) of the contract amount shall be required to be provided by the successful bidder to Fort Wayne Community Schools or its assignee no later than ten (10) days after the execution of such contract. Such bonds shall remain in full force and effect for a period of twelve (12) months after the date of Substantial Completion.

Details

Office, Renovation.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents