Similar Projects
Starbucks Drive-Through
New Construction - 1,687 SF
Conception
$500,000 to $1,000,000 CJ est. value
Hayward, CA 94544

Developments at the Lake Merritt BART Station
New Construction - 524,700 SF
Conception
$100,000,000 est. value
Oakland, CA 94607

Berkeley Commons Offices and Laboratories
New Construction - 728,088 SF
Design
$10,000,000 CJ est. value
Berkeley, CA 94710

2400 Adeline Condominium Development
New Construction - 45,750 SF
Design
$4,600,000 est. value
Oakland, CA 94607

La Vista Residential & The Primary School
New Construction, Infrastructure - 151,436 SF
Sub-Bidding
$75,000,000 CJ est. value
Hayward, CA 94544

La Vista Residential & The Primary School
New Construction, Infrastructure - 151,436 SF
Sub-Bidding
$75,000,000 CJ est. value
Hayward, CA 94544

Dublin Transit Center Parking Garage
New Construction - 178,835 SF
Post-Bid
$34,000,000 est. value
Dublin, CA 94568

Airport Pavement
Infrastructure
Post-Bid
Hayward, CA 94541

Excavation, HMA, Structural Concrete, Minor Concrete and Drainage
Infrastructure
Results
$23,400,000 est. value
CA

General Engineering (A License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
Infrastructure, Alteration
Results
$5,000,000 est. value

The Launch Apartments
New Construction
Construction
$166,000,000 est. value
Alameda, CA 94501

Studio 2000
New Construction, Demolition - 43,567 SF
Construction
$10,000,000 est. value
Berkeley, CA 94704

Timber Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Newark, CA 94560

Timber Senior Housing
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Newark, CA 94560

Monarch Bay Shoreline Development Project
New Construction
Conception
San Leandro, CA 94577

Last Updated 01/10/2023 03:33 PM
Project Title

Monarch Bay Shoreline Development - Phase 2

Physical Address View project details and contacts
City, State (County) San Leandro, CA 94577   (Alameda County)
Category(s) Commercial, Entertainment/Recreation, Government/Public, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Golf Course, Hotel/Motel, Library - Public, Parking Garage, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $127,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a multi-phased mixed-use development on a total of 52 acres. Phase two is expected to include the hotel portion of this project with a nine-hole golf course, and two 5,000-square-foot and 7,500-square-foot restaurants. As of January 10, 2023, the project has received entitlements, and will begin the permitting process. An architect has been selected. Information regarding how and when a general contractor will be selected has not yet been confirmed. Site prep and construction will begin in 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

,, 36,000 SF - 21,000 SF. 3 Stories Above Grade, New Construction, New Construction. 12,500 SF. 2,500 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Furniture, Hospitality Furniture, Institutional Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Turf and Grasses, Plants, Planting Accessories.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Utility Water Drains, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents