Similar Projects
Heating-Ventilating-Air Conditioning (HVAC) Energy Management and Control System Inspection and Service
Alteration
Post-Bid
Hooksett, NH

Maple Street School RTU Replacement
Alteration
Post-Bid
Hopkinton, NH 03229

NHARNG Cooling Upgrades
Results
Less than $1,200,000 est. value
Concord, NH 03301

HVAC Unit - Supply and Install
Results
Concord, NH

HVAC - Boiler replacement
Alteration
Post-Bid
$30,000 est. value
Concord, NH 03301

HVAC Preventative Maintenance and Repair Services
Term Contract
Results
Concord, NH

HVAC - Heat Pump Replacement
Alteration
Post-Bid
$200,000 est. value
Concord, NH

HVAC Maintenance and Repair Services
Term Contract
Results
Concord, NH

HVAC Preventative Maintenance and Repair Services
Alteration
Results
Berlin, Concord, Manchester, NH

HVAC Maintenance, Repair and Replacement Services
Alteration
Results

Heating System Improvements
Alteration
Results
$750,000 est. value
NH

Boiler and HVAC Maintenance
Alteration
Results
NH

Fire Academy HVAC Upgrades Phase 2
Alteration
Results
$200,000 est. value
Concord, NH 03301

Air Filters
Alteration
Results

HHS and DES Mechanical Replacements and Controls
Alteration
Results
$2,200,000 est. value
Concord, NH 03301

Reported 05/25/2022 12:00 AM
Project Title

UNH Law - 2 White Street HVAC Removal and Replacement of 3 Rooftop Units

Physical Address View project details and contacts
City, State (County) Concord, NH 03301   (Merrimack County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The general scope of work for this project includes the removal of three old existing rooftop HVAC units and replacement with Dakin HVAC units. Provide three separate mobilizations to remove and install three rooftop units with a crane. Provide and install three Dakin replacement rooftop units. Two on structural steel and one on an existing rooftop curb. Provide a licensed electrician to disconnect and reconnect the units. Provide a controls contractor to disconnect and reconnect the rooftop units and install into the graphics system. Provide and install all sheet metal duct work to connect the building system to the new rooftop units with insulation and venture clade covering. Perform a complete start up of the equipment and produce reports to hand over to the end user along with operator manuals for the roof top units. Remove and recycle the three existing roof top units.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents