Project Title | RFP Engineering - Perpetuation - STH 32 from S County Line Road to Forest Hill Ave - Pavement Replacement |
Physical Address | View project details and contacts |
City, State (County) | Milwaukee, WI 53204 (Milwaukee County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected October 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $10,000,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of January 6, 2023, this project is in the conceptual phase. An engineer has been selected but not awarded. Although a firm timeline for construction has not been determined, construction is not expected to start prior to October 2023. *The closed solicitation has been included below for reference: Transportation Region/Bureau: Southeast Region Solicitation ID: SE-05 Anticipated Construction Cost: $9,000,000-$9,999,999 Route : STH 032N County : 40 - Milwaukee County Limit : S County Line to Forest Hill Ave The pavement needs replacement and drainage need improvement. Perpetuation to replace the pavement of approximately 5 miles of STH 32 from S County Line Road to Forest Hill Ave. within the City of Oak Creek, in Milwaukee County. Replace/update signals, evaluate and upgrade curb ramps, and investigate spot repairs to curb and gutter and islands. An overlay will be completed at STH 32 intersections with STH 100 and County Line Road The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Information on the report may be found electronically Advertised Fixed Fee %: 7.25 The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interview: Interviews will not be conducted The method of contractor selection has not been determined at this time. WisDOT - RFP Engineering - Perpetuation - Pavement Replacement *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |