Similar Projects
Wastewater Pumping Station Rehabilitations Design-Build
Design
Less than $19,000,000 est. value
Tampa, FL 33602

Storm Water Pump Station Repair and Rehabilitation Services, Countywide
Renovation
Bidding
$3,292,029 est. value
FL

Park Gravity Sewer Replacement
Infrastructure
Bidding
$861,391 est. value
Tampa, FL

DSSC Building Interior Planter Infill Tennis Center Lift Station
Renovation
Sub-Bidding
Tampa, FL 33614

Continuing Contracts for Construction Manager at-Risk Services
Post-Bid
Plant City, FL

Water and Sewer Materials
Infrastructure
Post-Bid
$4,500,000 est. value
Tampa, FL

South County Potable Water Repump Station Expansion
Addition
Results
Less than $3,240,000 est. value
Ruskin, FL 33570

Wastewater Collection System Repair - FY21
Term Contract
Results
Less than $2,500,000 est. value
Tampa, FL 33602

Bridgeford Oaks Lift Station Rehabilitation
Construction
$225,000 est. value
Tampa, FL 33637

Construction, Flow Diversion from Falkenburg AWTP to Valrico AWTP
New Construction
Bidding
$18,863,000 est. value
Valrico, FL 33594

Low Pressure Sewer System (LPSS) SCADA Equipment Installation and Monitoring
Infrastructure
Post-Bid
$3,631,800 est. value
FL

Lift Station Renovation for South County Career Center
Renovation
Results
Ruskin, FL 33570

Fire Rescue 25 Septic Tank Drain Field Repair
Infrastructure
Bidding
$14,000 est. value
FL

Belmar Gardens Wastewater Collection System Rehabilitation By CIPP
Infrastructure
Post-Bid
$1,206,000 est. value
Tampa, FL

Vacuum and High Pressure Jetting Truck Services for the Wastewater Department
Term Contract
Results
Tampa, FL 33605

Last Updated 04/15/2022 02:33 AM
Project Title

Ballast Point Pump Station Force Main Extension

Physical Address View project details and contacts
City, State (County) Tampa, FL   (Hillsborough County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Precast Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents