Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Roadside Safety Improvements
Infrastructure
Design
$3,831,000 est. value
Holtville, CA

Final Closure of the Hot Spa Solid Waste Site
Infrastructure
Bidding
$4,000,000 CJ est. value
Brawley, CA 92227

Aten Road Class I Bicycle Path
Infrastructure
Bidding
$843,305 CJ est. value
Imperial, CA 92251

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Drilling Services
Term Contract
Post-Bid
Calexico, CA

Dogwood Avenue Improvement Project
Infrastructure
Results
$900,000 est. value
El Centro, CA

Heber Avenue Improvements
Infrastructure
Results
$953,375 est. value
Heber, CA 92249

Heber Meadows Apartments Residential Development / El Centro
New Construction, Infrastructure
Design
$108,633,600 CJ est. value
El Centro, CA 92243

Western Avenue Improvements Project Between Wildcat Drive & Legion Street
Infrastructure
Bidding
$1,776,606 CJ est. value
Brawley, CA 92227

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Street Maintenance Improvement Project - FY 2021/2022
Infrastructure
Results
Calipatria, CA 92233

Extension of Imperial Avenue From Wake Avenue to Danenberg Drive Phase II
Infrastructure
Bidding
$3,300,000 CJ est. value
El Centro, CA 92243

Asphalt Seal Coat and Restripe at Various Sites
Infrastructure
Post-Bid
$60,000 est. value
Imperial, CA

Asphalt Rubber Binder Chip Seal, Pavement Markings and Shoulder Backing
Infrastructure
Results
$3,400,000 est. value
CA

Last Updated 10/06/2022 01:35 AM
Project Title

Legion Street Improvements Project From Highway 86 to Western Avenue

Physical Address View project details and contacts
City, State (County) Brawley, CA 92227   (Imperial County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $999,558 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Contract for the work advertised will be awarded to the lowest responsible bidder. The city reserves the right to reject all bids, waive any irregularities, or dispense with further bidding. BID BID BOND: Shall be completed in the forms provided as per Instructions to Bidders, and accompanied by a Certified Check, Cashiers Check, or a Bid Bond executed in favor of the City of Brawley in an amount of ten percent of the bid, to be forfeited as fixed and liquidated damages should bidder neglect or refuse to enter into a contract. LIQUIDATED DAMAGES: Liquidated Damages of $500.00 per calendar day are included in this project. PROJECT DESCRIPTION: The Work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and contract documents. The City of Brawley intends to improve Legion Street from Highway 86 to Western Avenue. The Construction includes paving of Legion Street, installation of water line, storm water line, curb and gutter, sidewalk, ADA ramps, street lights, the underground of an irrigation ditch, and structures among others as specified in the plans. The new improvements will match existing conditions to smoothly transition from the new design to the existing one without compromising safety after construction. It is intended that the work be completed in every respect under the Contract, and such items or details not mentioned above that are required by the Contract documents shall be furnished, performed, placed, constructed, or installed by the Contractor. COMPLETION OF WORK: The work must be completed within 120 calendar days after the commencement date stated in the Notice to Proceed. CONTRACTOR'S LICENSE: The contractor shall have a State of California Classification A Contractors license to perform the work. A bid submitted by any contractor not properly licensed at the time of bid opening shall be considered non-responsive and will be rejected. DISADVANTAGED BUSINESS ENTERPRISE (DBE): The City of Brawley has a DBE goal of Seven Percent (7%) for this project DEPARTMENT OF INDUSTRIAL RELATIONS-REGISTRATION REQUIREMENT FOR AWARD: No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations according to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations according to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations FEDERAL & STATE PREVAILING WAGE RATES: Per the provisions of California Labor Code Sections 1770, et seq., as amended, the Director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages per the standards outlined in such Sections for the locality in which the WORK is to be performed. It shall be mandatory upon the CONTRACTOR to whom the WORK is awarded and upon any subcontractor under CONTRACTOR to pay not less than said specified rates to all workers employed by them in the execution of the WORK. Statutory provisions for penalties for failure to pay Prevailing Wage Rates will be enforced. STATE PREVAILING WAGE RATES: According to the Labor Code of the State of California, the Director of Industrial Relations has determined the general prevailing rate of wages and employer payments for health and welfare, vacation, pension and similar purposes applicable to the work to be done. These rates and scales are attached to this package. The contractor to whom the contract is awarded and the subcontractors under him must pay not less than these rates for this area to all workers employed in the execution of this contract. APPRENTICES: Attention is directed to the provisions of Sections 1777.5 and 1777.6 of the Labor Code Concerning the employment of apprentices by the Contractor or any subcontractor under him. It shall be the Contractor's responsibility to ensure that all persons shall comply with the requirements of said sections in the employment of apprentices. RETENTION: City will retain a portion of the Contract price as required by law. The Contractor may substitute securities in place of the retained funds withheld by the City. Alternatively, an escrow agreement, in the form prescribed under Ca. Public Contract Code 22300, may be used by the Contractor. Questions during the bidding process shall be directed to Mr. Phillip Ramirez,180 South Western Avenue, Brawley, CA., Telephone (760) 344-5800, Ext. 14, or by email at pramirez@brawley-ca.gov, no later than 5:00 p.m. September 26, 2022.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents