Similar Projects
Non-Potable Reservoir Pump Station
Post-Bid
Brighton, CO 80601

Marcy Gulch Lift Station Project
New Construction
Post-Bid
Highlands Ranch, CO 80129

Grandview Pump Station Phase I: Building Improvements and/or Phase 2 and Site Improvements Projects
Renovation
Results
Durango, CO 81301

Lift Station Pump Replacement
Results
Denver, CO 80202

Glenview Owners` Association Booster Pump Station
Construction
Less than $420,000 est. value
Buena Vista, CO

Binney Connection Project Treatment and Pumping Package
New Construction
Post-Bid
$19,000,000 est. value
Aurora, CO 80010

Smoky Hill Pump Station Improvements
Results
$3,200,000 to $3,670,000 est. value
Aurora, CO 80012

Lift Station A And Force Main Project
Post-Bid
Northglenn, CO 80241

Gun Club Road Pump Station Major Improvements Project
Results
$5,000,000 to $5,400,000 est. value
Aurora, CO

The Lakes at Centerra Metropolitan District Lakes Phase 7 Non-Potable Pump House
Post-Bid
Loveland, CO 80537

Ridgegate First Street Lift Station
Results
Lone Tree, CO

Waterbury Lift Station 2019 Repairs
Post-Bid
Centennial, CO 80011

Oak Grove Elementary School Christmas Break Sewage Lift Station Upgrade Project
Results
Montrose, CO

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

Lift Station Upgrades Project in Greenwood Village
Results
Less than $1,544,555 est. value
Greenwood Village, CO

Reported 06/02/2020 12:00 AM
Project Title

United Reservoir North Cell Pump Station

Physical Address View project details and contacts
City, State (County) Greenwood Village, CO   (Arapahoe County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 05/11/20
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of a but is not limited too; furnish and install all labor and materials for site preparation and building construction activities including: 1) install BMP`s; 2) excavation, hauling, moisture conditioning and compaction of approximately 75,000 cubic yards of earthwork; 3) installation of approximately 2,500 cubic yards of riprap 4) construct a 64-foot deep concrete wetwell; 5) site grading & drainage, miscellaneous concrete structures, including a baffle structure and building foundation; 6) installing pump station yard piping, meters, valves and meter vault; 7) construct pump station metal building, electric, mechanical and controls; 8) install roadbase and fencing and 9) fine grading and seeding/mulch;

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents