Similar Projects
Replacement of Mercer County Bridges 252.2 & 252.8 Carrying Hopewell Rocky Hill Road Over Branch of Bedens Brook
Results
Trenton, NJ 08611

Bridge Repairs and Resurfacing-Milepost 0 to 92 and thePearl Harbor Memorial Turnpike Extension
Results

Bridge Preventive Maintenance Contract 2018-4; Fifty-two (52) Bridges
Term Contract
Results
$5,000,001 to $10,000,000 est. value

Maintenance Concrete Structural Repair Contract, Central - 2019; Various Locations; Hunterdon, Mercer, Middlesex, Monmouth, Ocean, Somerset and Warren (South Of Route 57) Counties
Term Contract
Results
$10,000,001 to $20,000,000 est. value

Maintenance Job Order Contracting (JOC) Bridge Repairs, South - 2018
Results
$5,000,001 to $10,000,000 est. value

Maintenance Movable Bridge and Tunnel Repair
Results
$10,000,001 to $20,000,000 est. value

Lawrence Hopewell Trail-Stony Brook Pedestrian Bridge And Trail Extension
Results
Hopewell, NJ 08534

Replacement of Mercer County Bridge No. 861.1 Old Trenton Road (CR 535) Over Tributary Millstone River
Results
NJ

Replacement of Mercer County Bridge No. 216.6
Results
Trenton, NJ

Alexander Road, Bridge Over D and R Canal Structure
Results
Less than $5,000,000 est. value
NJ

Replacement of County Bridge #330.1 Carrying Alexander Street Over Stony Brook and County Bridge #331.1 Carrying Alexander Street Over Alexander Creek
Results
Princeton, NJ 08540

Restoration of the Jackson Street Bridge
Results
Trenton, NJ 08608

Bridge Repairs and Resurfacing; Milepost 0 to 92; and the Pearl Harbor Memorial Turnpike Extension (2020)
Results
Woodbridge, NJ

Replacement of County Bridge #672.2 (Structure #1100-007) Carrying Yardville-Groveville Road/Church Street (CR609) Over Doctor's Creek located in Township of Hamilton, Mercer County
Results
Hamilton Township, NJ 08650

Drawbridge Preventive Maintenance
Results
$10,000,001 to $20,000,000 est. value

Last Updated 03/08/2019 09:21 AM
Project Title

Route 295, CR 579 to Railroad Bridge

Physical Address View project details and contacts
City, State (County) NJ   (Mercer County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,001 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Route 295, CR 579 (Bear Tavern Road) to Railroad Bridge, Resurfacing Project, Contract No. 001124120, Townships of Ewing and Hopewell, County of Mercer. Roadway Quantity Unit Description 7,626 Sy Removal Of Pavement 152,471 Sy Hma Milling, 3" Or Less 7,137 t Hot Mix Asphalt 12.5 m 64 Surface Course 3,443 t Hot Mix Asphalt 25 m 64 Base Course 19,376 t Stone Matrix Asphalt 12.5 Mm Surface Course 9,155 Lf Beam Guide Rail 9,960 Lf Beam Guide Rail, Dual-Faced
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents