Similar Projects
Mount Peace Cemetery Expansion
Alteration
Conception
Akron, OH 44303

Wyoga Lake Road Infrastructure & Apartment Building
New Construction - 2,000 SF
Design
Cuyahoga Falls, Stow, OH 44224

Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

Gilchrist Road - Four Lane Resurfacing
Infrastructure
Bidding
$592,448 est. value
Akron, OH 44325

SR 241/SR 764 - Four Lane Resurfacing
Infrastructure
Bidding
$3,275,000 est. value
Akron, OH 44306

Spot Safety - D04 PSIP Phase 2
Post-Bid
Akron, Canton, Youngstown, OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Major Reconstruction - SR 8/IR 76/IR 77-00.63/09.74/08.42
Results
Akron, OH 44301

2021 Asphalt Resurfacing and Patching Program
Results
$3,159,012 est. value
Hudson, OH

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Brandywine Road Phase 1
Results
$521,391 est. value
Boston Heights, OH

Corporate Woods Circle/Boettler Road
Infrastructure
Post-Bid
$6,077,914 est. value
Green, OH 44685

Restoration of Pavement for Utility Repair Excavations
Results
$199,995 est. value
Cuyahoga Falls, OH

Ravenna Road Resurfacing Part 1
Infrastructure
Post-Bid
$956,257 est. value
Akron, OH

2021 Road Improvements
Results
$1,000,000 est. value
Twinsburg, OH 44087

Reported 06/15/2022 11:11 AM
Project Title

Hudson Greenway Trail - State of Ohio

Physical Address View project details and contacts
City, State (County) Hudson, OH 44236   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2023
Bids Due View project details and contacts
Estimated Value $750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined. This project is in included in the State of Ohio - Administrative Services FY 2022-2023 Capital Improvement Plan (CIP). As of June 14, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents