Similar Projects
Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Community Facilities District (CFD) for Gladden Farms Clark Farms Boulevard
Infrastructure
Bidding
Marana, AZ

FY22 Pavement Repair and Presentation Program - Repair Countywide Arterial Collector Roadways Surface Treatments
Infrastructure
Bidding
$700,000 to $900,000 est. value
AZ

High Water Crossing at Vamori Wash
Post-Bid
$10,000,000 to $20,000,000 est. value
Tucson, AZ 85746

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Pavement Rehabilitation
Results
Less than $21,640,000 est. value
AZ

Avra Valley Pavement Reconstruction Project - Phase 2
Results
Less than $2,000,000 est. value
Marana, AZ

Rocking K South Infrastructure
New Construction - 14,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Tucson, AZ 85747

Costco #407 Entry Drive Widening
Renovation
Construction
Tucson, AZ 85712

Paving Services
Infrastructure
Bidding
$4,000,000 est. value
Tucson, AZ

Groundhog Vista Landowners Roadwork
Post-Bid
Tucson, AZ 85743

Santa Rita High School Sewer Pipe Repair Project
Results
Less than $149,988 est. value
Tucson, AZ 85730

Mandarina Off-Site Water & Sewer
Infrastructure
Construction
Marana, AZ

Pavement Preservation.
Infrastructure
Bidding
$7,900,000 est. value
AZ

Gladden Farms Birchfield Drive and Mikeetter Boulevard (East)
Infrastructure
Post-Bid
Marana, AZ

Reported 01/06/2022 12:00 AM
Project Title

Roadway, Sewer and Pedestrian Crossing Improvements

Physical Address View project details and contacts
City, State (County) Tucson, AZ 85712   (Pima County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 12/03/21
Owner View project details and contacts
Architect View project details and contacts
Description

Install of Roadway, Sewer and Pedestrian Crossing Improvements. Public roadway, public sewer and pedestrian crossing improvement projects within the Rancho Sahuarita master plan in Sahuarita, Arizona. The projects include: PROJECT NO. A-4: Rancho Sahuarita Boulevard, Phase 8C, PROJECT NO. A-5: Public Sewer Main Extension Region 7Cand PROJECT NO. A-2: Pedestrian HAWK Crosswalk. Project A-4 consists of grading, sewer improvements and sleeving, drainage improvements including the construction of two (2) precast concrete drainage structures, together with roadway and landscaping improvements for Rancho Sahuarita Boulevard, Phase 8C from STA 51+65.85 to STA 63+81.65. Project A-5 consists of public sewer improvements for Region 7C. Project Number A-2 consists of public Pedestrian HAWK crosswalk improvements to an existing public roadway.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents