Similar Projects
Reported | 09/23/2021 12:00 AM |
Project Title | CUNY Baruch College Bleachers |
Physical Address | View project details and contacts |
City, State (County) | New York, NY (New York County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Furnish, deliver and install bleachers at Baruch College as manufactured by Hussey Seating MAXAM 26 Seating System as the basis of design, or propose an equivalent, with Courtside plastic seats, wall attached, integral power operation wireless controller, 11 5/8” row rise, 26” row spacing, with foot level aisle, aisle rails, intermediate aisle steps, non-slip treads, self-storing ready rails, front step, clear wood decking, motion monitor, Flex-Rows to accommodate ADA requirements and vinyl end curtains. Bleachers will be located in Cellar Gymnasium. This scope includes removal of existing bleachers. A site visit has been scheduled for bidders to view the existing bleachers and field verify. Bleacher Replacement & Installation: Removal, disassembly and disposal of the existing bleachers and furnish, delivery and installation of new bleachers. |
||||||||||
Details | Park/Playground, Renovation.
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |