Similar Projects
Fountain City Service Base Sustainment & Modernization
Design
Fountain City, WI

Pheasant Branch Stream bank Stabilization Mainstem Pond
Infrastructure
Bidding
$1,077,485 est. value
Middleton, WI 53562

Maintenance Dredging and Culvert Replacement
Infrastructure
Bidding
$600,000 est. value
Columbus, WI

Culverts
Term Contract
Post-Bid
WI

2021 Culvert Pipes
Post-Bid
WI

Concrete Floor Trench Drain and Grate Replacement
Results
Oconomowoc, WI

Highway Cross Culverts Replacement at Various Locations
Results
$225,000 est. value
Bristol, WI

Rudolph - Knowlton, STH 34 and CTH DB / Old 51 Intersection
Infrastructure
Bidding
$2,000,000 to $2,999,999 est. value
Mosinee, WI 54455

Concrete Box Culverts
Post-Bid
WI

Packwaukee - Plainfield, STH 73 Interchange; Plainfield - Wisconsin Rapids, 5th Avenue - 4th Court
Results
WI

Shady Lane and Shady Nook Reconstruction and Hill N' Dale Drainage Improvements
Infrastructure
Bidding
$2,400,000 est. value
Pewaukee, WI 53072

Culverts and Guardrails
Post-Bid
Waukesha, WI

Morner Road - Goetzke Road, Douglas Creek Bridge, B-50-92; V. Prentice, Railroad Street (Cth A), South Fork Jump River Bridge
Results
Prentice, WI

The Removal and Replacement of the Culverts under the Road Bed of State Road
Infrastructure
Bidding
$700,000 est. value
Black Creek, WI 54106

Culvert Materials
Post-Bid
WI

Reported 05/10/2022 12:00 AM
Project Title

Culvert Replacement Project on Crist Lane

Physical Address View project details and contacts
City, State (County) Darlington, WI 53530   (Lafayette County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $185,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of removing the existing box culvert and replacing it with a 50' x 60" steel culvert. The project will consist of providing the new culvert with end wall, Est. 300 yards backfill material, Est. 250 yards aggregate base material, landscaping and restoration of both right of way and roadway including cold mix Asphalt.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents