Similar Projects
Paving Project
Infrastructure
Bidding
$200,000 est. value
Lehighton, PA

2022 Bituminous Paving
Infrastructure
Bidding
$82,000 est. value
Jim Thorpe, PA

2021 Bituminous Paving
Post-Bid
Lehighton, PA

Lower Baers Road Project State Game Lands #217
Infrastructure
Post-Bid
PA

Milling and Paving Project
Results
$451,716 est. value
Weatherly, PA 18255

SE Blue Mountain Road Access SGL 217
Results
PA

2021 Bituminous Paving Project
Infrastructure
Post-Bid
Weatherly, PA 18255

Roadway and Miscellaneous Repairs
Results

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

3rd Street, South Street And North 1st Street Distribution Main Replacement
Results
Lehighton, PA 18235

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Blacktop Work
Results
Lansford, PA 18232

SR 903 Jim Thorpe
Infrastructure
Post-Bid
$500,000 to $999,999 est. value
Jim Thorpe, PA 18229

2021 Road Improvement Project
Results

2022 Multi Location Paving Project
Infrastructure
Post-Bid
Jim Thorpe, PA

Reported 06/21/2022 10:35 AM
Project Title

Jim Thorpe Retaining Wall

Physical Address View project details and contacts
City, State (County) Lehighton, PA 18235   (Carbon County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Design Development
Bids Due View project details and contacts
Estimated Value $3,144,640
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a civil project in Lehighton, Pennsylvania. Design plans call for site work for a road / highway; and water / sewer project. SR 209 (Mauch Chunk St.) seg 230/0000 to seg 240/0000 Jim Thorpe Borough AND Lehighton Township, Carbon County. As of June 20, 2022, the project is in development stage. Anticipated letting date is April 11, 2024. PennDOT - Jim Thorpe Retaining Wall *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents