Similar Projects
Spring Creek Park Subdivision
New Construction
Conception
Kalispell, MT 59901

Y--GAOA - EMDD Fog Seal
Term Contract
Design
$100,000 to $250,000 est. value
Billings, MT 59101

Prickly Pear Creek Greenway Trail System - Segment 2 North and Kennedy Park Trails Project
Infrastructure
Bidding
Helena, MT

Construct ADA/PROWAG Compliant Paths and Sidewalks Along the North Side of East Pike Avenue From Quarry Street to 2nd Street
Infrastructure
Bidding
MT

Bozeman Yellowstone International Airport BZN Inline Baggage System 2021 Schedule 1
Renovation
Post-Bid
Belgrade, MT 59714

Sluice Boxes State Park Upper Trailhead Parking Improvements
New Construction
Post-Bid
$44,000 est. value
Belt, MT 59412

Lewis & Clark Caverns Buildings Re-Roof Project
Renovation, Alteration
Results
$150,000 est. value
Whitehall, MT 59759

Construction of a New Transit facility
New Construction - 3,360 SF
Results
Livingston, MT

Sidewalk and Curbing
Infrastructure
Bidding
Kalispell, MT

Mercury Street Improvements Project
Infrastructure
Post-Bid
Butte, MT 59701

24th Street West Central Avenue Signal, Turn Lane, and Pedestrian Improvements
Infrastructure
Results
Billings, MT 59102

Long-Term/Overflow Parking Lot Construction
Infrastructure, Alteration
Bidding
Kalispell, MT 59901

MetraPark Improvements
Renovation
Post-Bid
Billings, MT 59101

City ADA Project
Infrastructure
Results
Billings, MT 59102

Wilderness Trail Maintenance
Renovation
Bidding
Choteau, MT 59422

Last Updated 03/17/2022 03:00 PM
Project Title

Jaycee Park Sidewalk and Shelter Project

Physical Address View project details and contacts
City, State (County) Dillon, MT   (Beaverhead County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Misc. Structures, Park/Playground, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Jaycee Park improvements will include demolition of existing sidewalks throughout the park and around the park and construction of new sidewalks, ADA ramps, and a new shelter.

Details

Park/Playground, Renovation, Misc. Structures, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents