Similar Projects
Last Updated | 12/22/2022 01:03 PM |
Project Title | Main Campus - Building 1 - East Traction Elevator Modernization |
Physical Address | View project details and contacts |
City, State (County) | New Orleans, LA 70119 (Orleans County) |
Category(s) | Single Trades |
Sub-Category(s) | Conveying Systems |
Contracting Method | Competitive Bids |
Project Status | All Submissions Received, Selection Underway, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | East Traction Elevator Modernization - Bldg.1 - Modernization of one (1) traction elevator in building 1 (Isaac Delgado Hall) on Delgado's main campus. Completion- 90 Calendar Days Provide the materials, labor, equipment and supervision necessary for the modernization of one (1) traction elevator in building 1 (Isaac Delgado Hall) on Delgado's main campus. All work shall be in compliance with these Technical Specifications. New Cab Interior: Furnish labor and materials to provide and install new cab interior as described below and attached design. o Make: Inpro or the like. o Cab Style: Hercules o Panels: Brushed nickel 5E026 o Handrails: Stainless steel 1-1/2" round with stainless steel back plate behind handrails o Aluminum ceiling frame with black plastic laminate ceiling panels o 6 round, 4 watt, LED, recessed downlights. o Stainless steel toe kicks o Stainless steel reveals o Stainless steel return(s) o Floors to be replaced by others Hall Frames: Furnish labor and materials to wrap existing Hall door frames on all 3 floors with #4 stainless steel. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |