Similar Projects
Project Lava Phase 1
New Construction - 207,330 SF
Design
Palmetto, FL

Construction of the Park and Ride Lots A and B
Infrastructure
Bidding
$400,000 est. value
Bradenton, Sarasota, FL 34243

Condev Storage
New Construction - 183,857 SF
Bidding
Parrish, FL

Manatee High School Safety Improvements (North)
Post-Bid
Bradenton, FL 34201

King Middle School Covered Walkways
Infrastructure
Post-Bid
Bradenton, FL 34209

New Operations Campus on Property Located at 1420 28th Avenue East
New Construction - 70,100 SF
Results
Ellenton, FL 34222

Construction of Fire Station 2
New Construction, Addition - 1,728 SF
Results
$850,000 to $1,000,000 est. value
Bradenton, FL 34208

Sawgrass Storage Fka Parrish Lakes Storage
New Construction - 88,331 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Parrish, FL 34219

Public Storage
New Construction - 111,393 SF
Construction
$6,000,000 est. value
Bradenton, FL 34204

U-Haul Storage Facility #830-078
New Construction
Pending Verification
Palmetto, FL 34221

Marlow Marine
Addition - 13,200 SF
Pending Verification
Palmetto, FL

Florida Power & Light - Whitfield Fleet Building Extension
Addition - 930 SF
Post-Bid
Palmetto, FL 34221

Bayshore Road Sidewalk Improvements
Infrastructure
Results
FL

The Lock Up Storage
New Construction - 106,548 SF
Construction
$10,000,000 CJ est. value
Bradenton, FL 34205

Swift Self Storage
New Construction - 108,900 SF
Pending Verification
Bradenton, FL 34212

Last Updated 06/01/2022 07:08 AM
Project Title

Quick Turnaround Rental Car Facility Bid Package 3 (Tractor Trailer Lot and Boat and RV Storage)

Physical Address View project details and contacts
City, State (County) Sarasota, FL 34243   (Manatee County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,020,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes construction of new Tractor Trailer and Boat/RV Storage Lots and enabling work for Sarasota Bradenton International Airport. The package will include site work, grading, paving, lighting, fencing, pre-engineered metal buildings and other work.

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents