Similar Projects
Lighting Improvements Project for South College Street, Samford Avenue, and Gay Street In Auburn
Infrastructure
Bidding
$300,000 CJ est. value
Auburn, AL 36830

Lighting Improvements Project for South College Street, Samford Avenue, and Gay Street In Auburn
Infrastructure
Bidding
$300,000 CJ est. value
Auburn, AL 36830

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Saugahatchee Lake Golf Cart Bridge Water Main Support Repairs
Infrastructure
Post-Bid
Opelika, AL

Water Main Relocation on SR 51 Across Chewacla Creek
Results
Opelika, AL

Campus Parking Expansion Phase 1 - West Campus and Hay Fields
Results
Auburn, AL

Oak Bowery Pines
New Construction
Construction
Opelika, AL 36801

Cannon Gate
New Construction - 1,300 SF
Construction
Opelika, AL 36801

Son's Ford Parking Lot
Infrastructure
Pending Verification
Auburn, AL

Chapel Heights
New Construction, Infrastructure
Pending Verification
Auburn, AL

2022 Cured in Place Pipe (CIPP) Project
Infrastructure
Bidding
$370,000 CJ est. value
Auburn, AL 36830

Water Main Improvements
New Construction, Infrastructure
Post-Bid
Loachapoka, AL

Key Golf Teaching Facility - Driving Range and Short Course, Sand Traps and Drainage Improvements
Results
Auburn, AL

The Taylor
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Opelika, AL 36801

Highway 280 Sanitary Sewer Improvement to Serve the Summerville Road Area
Infrastructure
Bidding
$200,000 CJ est. value
Smiths Station, AL 36877

Last Updated 08/27/2022 10:31 AM
Project Title

Indian Pines Golf Course Renovation

Physical Address View project details and contacts
City, State (County) Auburn, AL 36830   (Lee County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Golf Course, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Indian Pines Golf Course Renovation - The complete list of items which should be included in the construction phase for the renovation of Indian Pines Golf Course include: Mobilization Erosion Control Demolition Clearing Earthwork Shaping Drainage Greens Construction Bunker Construction Tee Construction Irrigation Labor Cart Paths Finishing Grassing Guarantee will be required with each bid in the amount of at least five percent (5%) (not to exceed ($10,000) of the amount bid in the form of a certified or cashier's check or bid bond payable to the Indian Pines Recreation Authority, Inc. All bidders are required to be compliant with the Beason-Hammon Alabama Taxpayer and Citizen Protection Act, Act No. 2011-535 (Code of Alabama (1975) 31-13-9) as amended May 16, 2012 regarding employment practices. The successful bidder is responsible for acquiring the appropriate business licenses and permits to conduct work within the City of Auburn and the City of Opelika. Your attention in particular is invited to the "Instructions for Bidders", which is to be followed in all respects. The Indian Pines Authority, Inc. reserves the right to select the lowest responsible bidder as is in the best interest of the Indian Pines Golf Course, to award the purchase contract from any of the bids, to reject any and all bids, and to waive any informalities in bids received. Bids will be good for thirty (30) days after being opened by the Indian Pines Recreation Authority, Inc.

Details

Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Lockers, Flagpoles, Flags and Banners.
Division 22 - Plumbing, Facility Sanitary Sewerage, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting Irrigation, Planting Preparation, Turf and Grasses, Plants, Planting Accessories.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Utility Water Drains, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents