Similar Projects
Two Phases - Demolition and Build Out
Demolition, Renovation, Infrastructure
Design
$100,000 CJ est. value
New York, NY 10128

RFP Design - Fountain Elms Historic Home Exterior
Infrastructure
Bidding
$500,000 CJ est. value
Utica, NY 13502

Bolivar-richburg CSD 2021 Capital Improvements Project - Phase 2
Infrastructure
Sub-Bidding
$11,500,000 CJ est. value
Bolivar, NY 14715

Blast Mitigation Wall Hardening
Renovation
Sub-Bidding
$200,000 CJ est. value
New York, NY 11206

Exterior Finishing Work
Alteration
Post-Bid
$669,000 est. value
Kiryas Joel, NY

New Roof and Stucco Work at Fire Station 1
Alteration
Post-Bid
Wappinger, NY 12590

Gleeson and Laffin Halls Facade Investigation & Repair
Results
$1,000,000 to $2,500,000 est. value
Farmingdale, NY 11735

Hostel 10538 Windows and Siding Replacement
Alteration
Results
$175,000 to $225,000 est. value
Shushan, NY 12873

62 Main Street, Saranac Lake -Exterior Renovations
Alteration
Post-Bid
Saranac Lake, NY 12983

Windows and Facade Work at Town Hall and Town Hall II Manhasset
Renovation
Results
$1,527,420 CJ est. value
Manhasset, NY 11030

Delaware Valley Job Corps Center
Alteration
Post-Bid
$100,000 est. value
Callicoon, NY 12723

Nagler Hall Facade Repairs
Alteration
Results
$700,000 est. value
New York, NY 10001

Interior Painting and Finishes Restoration
Alteration
Post-Bid
$40,000 est. value
Buffalo, NY 14216

Chemung IRA - Rear Porch and Sidewalk Replacement
Infrastructure, Alteration
Results
$2,000,000 est. value
Chemung, NY 14825

Stucco Exterior of Building
Alteration
Post-Bid
$150,000 est. value
Brooklyn, NY 11213

Last Updated 09/19/2023 11:21 AM
Project Title

Replace Siding

Physical Address View project details and contacts
City, State (County) New York, NY 11436   (Queens County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $32,819 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contract term: 30 days of award Question Deadline 08/07/2023 Any vendor questions not asked during the site visit must be submitted in writing to: Brooklyn.CMM.Bids@opwdd.ny.gov This is an RFQ (request for quotes). This is not an IFB (bid). The Bernard Fineson DDSOO intends to award the contract to the most responsible and responsive vendor that provides the lowest cost and meets the requirements detailed in the scope of work. Upon request, vendor must demonstrate relevant experience on prior projects of similar magnitude. The Bernard Fineson DDSOO reserves the right to reject any and all quotes. In deciding whether to or not to submit a quote, please be aware the awarded vendor must adhere to the time frames outlined in the scope of work. The awarded vendor will also be required to submit certificates of Liability Insurance and Workers Compensation Insurance as well as completed Lobbying Law Forms, and Signed Appendix A. Please be prepared to submit these in a timely fashion. The Metro DDSOO will make no concessions to the vendor for any alleged misunderstanding or deception because of quantity, quality, character, or other condition. The Bernard Fineson DDSOOs interpretation of specifications shall be final and binding. Please note all staff working at the project site may be required to sign an attendance sheet for record purposes. This includes the residence visitors log and/or an attendance sheet provided by the maintenance department. Prevailing Wages and Certified Payroll Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 30% Women Owned Sub-Contracting Goal: 7% Service-Disabled Veteran-Owned Business Contracting Goal: 6% The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 30 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Site must be cleaned, and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of project, before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents