Similar Projects
Wastewater System Upgrades
Infrastructure
Bidding
Marshville, Monroe, NC 28103

Little Creek Wastewater Transmission Linework Improvements Project
Infrastructure
Bidding
Clayton, NC

Summer Rest Road Gravity Sewer Main Replacement
Post-Bid
$210,000 to $215,000 est. value
Wilmington, NC

Gastonia/Dallas Sewer Interconnection
Post-Bid
Gastonia, NC 28052

Nash Street Sanitary Sewer Extension
Results
Sanford, NC 27237

2018 Golden LEAF Disaster Recovery Project Contract No. 2 - Sanitary Sewer and Storm Sewer
Results
Parmele, NC

East Main Street Sanitary Sewer Rehabilitation and Replacement - Phase 1
Infrastructure
Bidding
Carrboro, NC 27510

Orange County Cedar Grove Community Center-Septic Upgrades
Post-Bid
Hillsborough, NC 27278

Water and Sewer Service Line Repair and Renewal
Results
Winston-Salem, NC

Githens School Lift Station and Force Main
New Construction, Infrastructure
Bidding
$4,000,000 to $5,000,000 est. value
Durham, NC 27704

Open End Construction and Repair Service Contract
Term Contract
Post-Bid
Rocky Mount, NC

West Neuse Interceptor, Upper Walnut Creek Interceptor and Neuse River East Parallel Interceptor
Results
Raleigh, NC

Blue Sky Sanitary Sewer Infrastructure
Infrastructure
Bidding
Oakboro, NC 28129

Maintenance on Sewer and Backflow Preventers
Term Contract
Post-Bid
Raleigh, NC 27699

Sweetbay Circle Aerial Crossing
Results
Fayetteville, NC 28302

Last Updated 11/01/2021 12:38 PM
Project Title

System-Wide Sewer Rehabilitation - Phase 3

Physical Address View project details and contacts
City, State (County) Winston-Salem, NC   (Forsyth County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes, but is not limited to, gravity sanitary sewer rehabilitation projects that consist of open cut pipe replacement, open cut point repairs, cured-in-place pipe, pipe bursting, replacement or rehabilitation of service laterals, restoring ground and roadway surfaces, traffic control, sanitary sewer manhole rehabilitations, etc. at multiple project areas throughout the City’s sanitary sewer system.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents