Similar Projects
WA - Willapa National Wildlife Refuge - New Boat Shop Roof
Renovation - 2,900 SF
Sub-Bidding
$100,000 CJ est. value
Ilwaco, WA 98624

City Hall Roof Removal and Replacement Project
Renovation
Sub-Bidding
$1,100,000 CJ est. value
Spokane, WA 99201

Port of Bellingham Re-Roof International Trades Building
Alteration
Post-Bid
$360,000 est. value
Bellingham, WA

Dirtworks Gazebo Roof Replacement project
Alteration
Post-Bid
Olympia, WA

Frenchman Hills Mold Remediation, Roofing Replacement, and Ventilation Improvements
Renovation, Alteration
Results
Royal City, WA 99357

Central Shop Re-Roof Project
Alteration
Results
$160,000 to $190,000 est. value
Bellingham, WA

South Base Re-Roof
Renovation
Sub-Bidding
$500,000 CJ est. value
Port Orchard, WA 98366

Roof Replacement at Glenhaven Condominiums
Alteration
Post-Bid
Langley, WA 98260

MHR Residential Roofing
Alteration
Results
Spanaway, Tacoma, WA

River Park Gazebo and Public Works Shop Roof Project
Renovation
Sub-Bidding
$400,000 CJ est. value
Sultan, WA 98294

Arlington Library Roof Replacement
Alteration
Post-Bid
Arlington, WA 98223

Roofing Services
Term Contract
Results
$272,484 est. value
Seattle, WA

Walnut Grove Roof Repair
Renovation - 19,000 SF
Sub-Bidding
$400,000 CJ est. value
Vancouver, WA 98662

Weatherization - URGENT Roof
Alteration
Post-Bid
WA

Fleet Services Roof Replacement
Alteration
Results
Seattle, WA

Last Updated 09/06/2022 06:01 PM
Project Title

Commerce Building Center (CBC) - Building 3 - Roof Replacement

Physical Address View project details and contacts
City, State (County) Lacey, WA 98516   (Thurston County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $411,905 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this contract is to provide and furnish and/or install all labor, materials and equipment, as may be required to complete the work as described in these documents to replace the roof located at Commerce Business Center (CBC) Building 3 at 2641 Willamette Dr. NE in Lacey, WA which is approximately 29,020 square feet The project is to remove the existing flat torch down roof and install a new 60mil single-ply Thermoplastic Polyolefin (TPO) roof. It is assumed that some wood structural panels will need to be replaced before the new7 roof will be installed and has been included in the cost estimate. The existing roofing is torch down roofing over 14" structural, wood sheathing panels spanning across 2x wood purlins at 24" on center. The purlins are supported on steel trusses at 8'-0" on center that span from the exterior tilt up concrete wall with intermediate beams at the interior. The parapet on the structures varies in height from 6-12" at the north side and approximately 4'-0" at the south side. The parapets have a galvanized flashing cap a round the perimeter. The building is used for commercial and retail use requiring several HVAC units and vents located on the roof. There are seven (7) HVAC units with curbs on the roof. There are (12) skylights that are used for fire safety and egress. In addition to the mechanical units, there are several pipe penetrations located throughout. There is an existing roof access hatch with a ladder on the inside of a tenant space. The roof hatch opens towards the north side near the north wall. The current roof hatch is not OSHA compliant and presents safety challenges. New TPO roof must be 60mil thickness, color white. Fully adhered 60mil TPO Roof with 2" Polyiso insulation under including a vapor barrier and roof board below the roofing. Bid must include the removal and dispos-al of existing roofing, removing damaged wood structural panels and installation replacements as needed and installation of new roof with flashing. Contractors have the ability to provide an alternative option that meet or exceeds the lifespan of the 60ml' TPO with insula-tion technology and can provide a more cost effective approach for the Port. This option requires engineer approval prior to plac-ing a bid using the alternative and must be submitted no later than. 12:00pm on July 27th. Any/all approvals will be made via adden-dum to the bid documents, It is essential that the Contractor cleans daily and does not impact the current tenants the CBC Building #3. The Engineer's Estimate for i.s $315,963 to $392,777. All inquiries regarding the con-tents and requirements of this Bid must be in writing and directed to Christopher Martinez, Contract and Grant Administrator, via email: ChrisM@PortOlympia. coin, Each bid must be accompanied by a Certified Check. or Bid. Bond in an amount equal to five (5) per-cent of the Total Bid. The Port. of Olympia reserves the right to reject any and all bids, *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents