Project Title | Mitchell HS and Gardenview ES Chiller Replacements |
Physical Address | View project details and contacts |
City, State (County) | Memphis, TN 38103 (Shelby County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $400,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of December 22, 2022, this project has not yet been awarded. Anticipated award date is on January 23, 2023.** Mitchell High School and Gardenview Elementary School Chiller Replacements. Attention Perspective Bidders: The "Doing Business with MSCS" tab is now located at the bottom of the page of the MSCS website. Click on the link in order to access MSCS Bid''s and RFP''s Question Deadline 10/05/2022 at 2:00 PM CT Submitted in writing via e-mail to LaQueeya Braxton at braxtonl@scsk12.org or LaJuanna Jones-Sulton at jonessultonlm@scsk12.org SCBE has set a Minority or Woman-owned Business Enterprises goal for Mitchell HS 12.7% and Gardenview ES 12.7% for this project, Mitchell High School: 1. Replace both chillers for the main building. 2. Replace the chiller for the auditorium. 3. Chillers shall be provided to meet latest MSCS design guide. 4. Provide manual isolation valves for all chillers. 5. Provide motorized isolation valves to each chiller for the main building to prevent water flow when chiller is not operating. Install a bypass in the pipe. 6. All outside piping to be heat traced and weather/waterproof with metal jacket. 7. Connect each chiller to the new Siemens BAS server. 8. Demo and remove existing chillers and piping as needed. 9. Installation shall follow latest local building codes. 10. Install P/T ports and drain valves in each pipe and at the chiller. 11. Modify Electrical as needed. 12. Tag each pipe with direction of flow. 13. Provide water balance report. Gardenview Elementary School 1. Replace both chillers. 2. Chillers shall be provided to meet latest MSCS design guide. 3. Provide manual isolation valves. 4. All outside piping to be heat traced and weather/waterproof with metal jacket. 5. Connect each chiller to the Siemens BAS server. 6. Demo and remove existing chillers and piping as needed. 7. Installation shall follow latest local building codes. 8. Install P/T ports and drain valves in each pipe and at the chiller. 9. Modify Electrical as needed. 10. Tag each pipe with direction of flow. 11. Provide water balance report |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |