Similar Projects
East Village Infrastructure
Post-Bid
$7,686,825 est. value
Charlotte, NC

Wake Forest Road/Blount Street/Person Street Phase I Improvements
Post-Bid
Raleigh, NC

Optional Industry Forum and DBE Outreach Session
Results
Less than $2,200,000,000 est. value

Optional Industry Forum and DBE Outreach Session
Results
Less than $2,200,000,000 est. value

Harris Teeter #345
Renovation - 58,652 SF
Construction
$3,509,985 est. value
Burlington, NC 27215

Ligon Mill Road Improvements
Post-Bid
Wake Forest, NC

Upgrading U.S. 70 to a Freeway
Results
NC

AST Paving and Resurfacing Project
Post-Bid
Raleigh, NC

Triangle Expressway Southeast Extension, NC 55 Bypass to East of Pierce Olive Road
Results
NC

Crossfield Taxiway - Package 1
Post-Bid
Greensboro, NC 27409

Asphalt Resurfacing
Results
Hillsborough, NC

International Drive Pavement Rehabilitation
Post-Bid
Less than $5,000,000 est. value
Morrisville, NC 27560

Widens I-95 to Eight Lanes and Reconstructs Interchanges from South of I-95 Business / US 301 (Exit 56) to North of SR 1002 (Long Branch Road - Exit 71) in Cumberland and Harnett Counties.
Results

Construction Manager for UNC Charlotte East Village Infrastructure
Post-Bid
Less than $6,000,000 est. value
Charlotte, NC

Wrightsville Beach Paving Project
Results
Wrightsville Beach, NC

Last Updated 01/21/2021 10:42 AM
Project Title

Carvoa Roads Construction

Physical Address View project details and contacts
City, State (County) Currituck, NC 27929   (Currituck County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Clear right-of-ways to 30 feet wide and 13 feet high on Bass Lane, Pompano Lane, Swan Island Road, Dolphin Lane, Grebe Road, Plover Court, and Swan Road (total length: 10,360 linear feet); 2. Remove vegetation and non-heritage trees adjacent to the Bass Lane fire pond, existing ditch, and within the 115-foot by 90-foot ‘Material Staging Area’; 3. Excavate 90-feet long by 10-feet wide by 10-feet deep section on the east side of existing fire pond on Bass Lane for fill material (total excavate volume: 333 cubic yards); 4. Remove 7 existing culverts and install 9 new culverts with inlet and outlet protection on Bass Lane, Pompano Lane, and Red Snapper Lane (total length per new culvert: 24 feet, 18 inch inside diameter reinforced concrete pipe); 5. Fill, spread, and grade 19 areas with sand material along Bass Lane, Pompano Lane, Swan Island Road, Red Snapper Lane, Dolphin Lane, Grebe Road, Plover Court, and Swan Road (total fill volume: 800 cubic yards); 6. Widen roads to a width of 20 feet on Bass Lane, Pompano Lane, Swan Island Road, Dolphin Lane, Grebe Road, Plover Court, and Swan Road (total length: 10,360 linear feet). 7. The following may be potential additive items for this project: a. Removal of additional vegetation and non-heritage trees b. Installation of additional reinforced concrete pipe culverts c. Import of select fill material

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents