Similar Projects
Last Updated | 02/17/2024 09:33 AM |
Project Title | Fire Station No. 4 - Training Facility (Site Improvements) |
Physical Address | View project details and contacts |
City, State (County) | Costa Mesa, CA 92627 (Orange County) |
Category(s) | Government/Public |
Sub-Category(s) | Fire/Police Station |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected April 2024 |
Bids Due | View project details and contacts |
Estimated Value | $2,698,888 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | License Requirements CLASS B Liquidated Damages $1,900.00 per day Start/Delivery Date WITHIN 10 DAYS OF AWARD OF THE CONTRACT Project Duration 180 WORKING DAYS Online Q&A Yes Q&A Deadline 02/06/2024 5:00 PM (PST) The work includes site preparation, demolition of a portion of the existing asphalt pavement and its replacement with a combination of a new concrete slab on grade, new crew parking area, miscellaneous pavement, ADA accessibility improvements and treatment of the existing asphalt surface; an attached structure with decontamination showers and restrooms for training use; an underground water recovery system that reconfigures the existing storm drain system (with pumps), a solar panel system mounted over carports, the site preparation, footing excavation and layout of a structural footing along with the installation of an lighting electrical system for a prefabricated structure (tower pre-fabrication and installation done by others), and deferred solar panel submittals for the Building Department and Fire review, approval, and permits. Other Details The Contractor shall coordinate the installation of a prefabricated tower with WHP Training Towers TM. The general scope of work includes site and ground improvements, decontamination showers and restrooms, a water recirculation system, solar panel mounted on carports among other miscellaneous improvements to the training area, and site preparation and footing excavation for the prefabricated tower and stairs. 1. NEW PRE-FABRICATED FOUR-STORY WHP FIRE TRAINING TOWER (OWNER FURNISH, OWNER INSTALL, UNDER A SEPARATE PERMIT: BPCC-23-0116). 2. NEW UNDERGROUND WATER RECOVERY SYSTEM, NEW CREW PARKING AREA WITH CARPORT, AND SITE IMPROVEMENT. 3. REMODEL DIRTY TRAINING CLASSROOM BUILDING, WITH 1,264 S.F. ADDITION. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |