Similar Projects
IDIQ MACC For Mechanical, Electrical, Plumbing, and Fire Protection Projects at Naval Station Great Lakes and NOSCS within the AOR of a 450-Mile Radius of Naval Station Great Lakes
Renovation
Design
$25,000 to $750,000 est. value

The Belvedere
New Construction, Infrastructure
Design
$80,000,000 CJ est. value
Naperville, IL 60564

Enclosure at 2A Raceway at the Fish Barrier
New Construction
Post-Bid
$1,000,000 to $5,000,000 est. value
Romeoville, IL

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

D/B Northeast MATOC
Results
$1,000,000 to $250,000,000 est. value

Access Control Point Program Design Build II -- RFI(2)
Results

Seasons at Plainfield - Multi-Family Development
New Construction - 450,752 SF
Construction
Plainfield, IL 60585

FY22 USACE LRD Regional Construction Management Services Multiple Award Task Order Contract (MATOC)
New Construction, Renovation, Term Contract
Post-Bid
$200,000,000 to $300,000,000 est. value
Chicago, IL

Mid-West Regional Construction IDIQ MATOC
Results
$50,000 to $80,000,000 est. value

Gutters New Homer Township Highway Department Building
New Construction
Post-Bid
Homer Glen, IL

SB Fuels Multiple Award Task Order Contract (MATOC)
Results
Less than $349,000,000 est. value
Washington, DC

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

Civil Construction Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Contracts
Results
$250,000 to $5,000,000 est. value

Civil Works Construction Management Services for the US Army Corps of Engineers Great Lakes and Ohio River Division
New Construction
Post-Bid
Less than $500,000,000 est. value

2021 Toilet Room Remodeling
Results
IL

Last Updated 10/05/2022 08:08 AM
Project Title

Renovation Work Troy Township Office and Community Center

Physical Address View project details and contacts
City, State (County) Shorewood, IL 60404   (Will County)
Category(s) Entertainment/Recreation, Government/Public
Sub-Category(s) Clubhouse/Social Club, Misc. Buildings
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $419,500 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 25,2022 bids were canceled. No definite date for the rebid For Renovation Work Troy Township Office and Community Center The work is to be performed in accordance with the proposed Contract Documents as prepared by Healy Bender Patton & Been Architects, 4040 Helene Avenue, Naperville, Illinois. During the bidding period, the office of the Architect will send project addenda, clarifications, and other project information to registered plan holders via the email address(es) listed on the Registered Plan Holder Record on file at the Architects office. Bids will be received on General Contract Work, including all trades. BIDDER RESPONSIBILITY Each Bidder must satisfactorily complete the Bidder Responsibility process described in Section 01 00 00 - Bidder Responsibility Criteria of the Project Manual by providing the required Documents. In the case of a joint venture or partnership, each joint venturer or partner must independently meet each of the requirements set forth in Paragraphs 1.02, 1.03, 1.04 and 1.05 in Section 01 00 00 - Bidder Responsibility Criteria. The required Documents must be delivered along with the bidders sealed bid at the same place and time required for the bid. Contents of each bidders Responsibility Criteria Documents will be available for public review. The Bidder Responsibility Documents will be reviewed by the Owner and Architect to determine the lowest responsible Bidder. Each bid must be accompanied by a Bid Guarantee in the form of a Bid Bond, Certified Check or Bank Draft in an amount equal to not less than ten percent (10%) of the bid and made payable to Troy Township, 25448 W Seil Road, Shorewood, Will County, Illinois. No bid shall be withdrawn for a period of thirty (30) days after the bids opening date without the consent of the Owner. Checks or drafts of unsuccessful bidders will be returned as soon as practical after opening and checking the bids. Successful bidder must provide a Performance Bond and a Labor and Material Payment Bond in the full amount of the Contract, acceptable to the Owner. This Contract is subject to the Illinois Prevailing Wage Act (820 ILCS 130/1 et.seq.). The Owner reserves the right to reject any or all bids and to waive any informalities in bidding. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The total estimated construction cost for the Base Bid and Alternate Bid work of this project is between $400,000 - $480,000. Bid Results BASE BID 1 GENERAL CONTRACT WORK - R. Berti Building Solutions - $361,500 BASE BID 2 EXTERIOR ENVELOPE REPAIRS - R.L. Sohol General Contractor, Inc. - $52,000 BASE BID 3 ROOFTOP REPAIRS - R.L. Sohol General Contractor, Inc - $6,000

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents