Similar Projects
Browning Street Extension - Browning Street to Hamblen Road
Infrastructure
Bidding
Lees Summit, MO

Choice Neighborhood Initiative Grant 8th Street and Woodland Ave Streetscape
Infrastructure
Bidding
Kansas City, MO 64106

Athletic and Parking Improvements Package B and Asphalt Improvements
Post-Bid
Independence, MO 64055

Kansas City MoDOT Parking Lot Paving
Infrastructure
Post-Bid
Kansas City, Lees Summit, MO

East Side of Ward Parkway - W 83rd Street to W 84th Street
Results
Less than $110,995 est. value
Kansas City, MO 64114

Marlborough Community Infrastructure - Package 3 Hickman Mills Drive
Results
Kansas City, MO

2022 Street Preservation Program Project
Infrastructure
Bidding
Oak Grove, MO

Asphaltic Paving and Striping of City Hall Parking Lot
Infrastructure
Post-Bid
Greenwood, MO 64034

Street Cut Repairs
Results
Independence, MO

Mill and Overlay FY23 Program
Infrastructure
Bidding
$200,000 est. value
MO

18th Street Pedestrian Mall Engineering Services
New Construction
Post-Bid
Kansas City, MO 64108

Pavement Repairs at District Transportation Building
Results
Grandview, MO 64030

Parking Lot Reconfiguration at Meadowmere Elementary School
Infrastructure
Bidding
$300,000 est. value
Grandview, MO 64030

63rd Street Reconstruction - Woodland Avenue to Prospect Avenue
Infrastructure
Post-Bid
Kansas City, MO 64121

SLBE 73rd St Jefferson to Pennsylvania Ave
Renovation
Results
Less than $49,275 est. value
MO

Last Updated 04/11/2022 08:33 AM
Project Title

2022 Asphalt Overlay Program

Physical Address View project details and contacts
City, State (County) Grandview, MO   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contract provides for an overlay of four (4) segments of streets ranging from approximately 1,903 SY to approximately 6,235 SY for a total of approximately 1,379 tons of asphalt. Cold milling of approximately 12,268 SY, 268 TONS of fulldepth asphalt (8 IN) cut and patch, 2,307 LF of lane striping, 1,530 LF of curb, and gutter replacement, 2,000 SF of 4 IN concrete sidewalk replacement, and 1,680 SF of 6 IN sidewalk ramp on this project. Alternate 1 One (1) street segment with cold milling of approximately 4,190 SY, 471 tons of asphalt, 210 SY of full-depth asphalt (8 IN) cut & patch, 435 LF of curb & gutter replacement, 1000 SF of 4 IN of concrete replacement, and 1,200 SF of 6 IN sidewalk ramp

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents