Similar Projects
Stormwater Repairs Phase III Construction
Alteration
Design
$5,200,000 est. value
WA

Raincity Partnerships
Infrastructure
Bidding
Seattle, WA

North Industrial Way Storm Water Retrofit and Overlay
Infrastructure
Bidding
$530,000 to $580,000 est. value
Pasco, WA 99301

Sewer Outfall Replacement
Infrastructure
Post-Bid
$1,500,000 to $2,000,000 est. value
Friday Harbor, WA 98250

Louis Thompson Tightline
New Construction, Infrastructure
Post-Bid
$5,800,000 est. value
Sammamish, WA 98074

Stratford Lane Step to Gravity Conversion
Infrastructure, Alteration
Results
$220,878 est. value
Olympia, WA

Ostrich Bay Creek Stormwater Treatment
Infrastructure, Alteration
Results
$1,000,000 to $1,300,000 est. value
Bremerton, WA

Friday Harbor Labs Sewer Repair
Renovation, Alteration
Post-Bid
$160,000 to $200,000 est. value
Friday Harbor, WA 98250

Engineering Services for Parking Lot And Trailhead Development & Stormwater Management Plan
New Construction, Infrastructure
Results
Blaine, WA 98230

Environmental Consulting Services for 2021 Stormwater Code Amendments
Renovation, Alteration
Post-Bid
$75,000 est. value
Sammamish, WA 98075

Port Gardner Storage Facility
New Construction, Infrastructure
Results
Everett, WA 98213

Stromwater Operations and Maintenance
Alteration
Post-Bid
Port Orchard, WA 98366

Exposed Sewer Pipe Repairs - Site 5
Infrastructure
Results
$3,200,000 to $3,700,000 est. value
Bothell, WA 98011

Stormwater Management Plan
Alteration
Post-Bid
WA

Cathodic Protection Installation
Infrastructure
Results
$175,000 est. value
Tacoma, WA

Last Updated 12/17/2021 05:08 PM
Project Title

144th Street E Sewer Extension

Physical Address View project details and contacts
City, State (County) WA   (Pierce County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,000,000 to $8,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The successful bidder will be responsible for installation of approximately 12,360 linear feet of gravity sewer pipe, 1,151 linear feet of sewer force main, 33 concrete manholes, and 5 corrosion resistant manholes and a valve vault. The work also includes installing and maintaining erosion control BMPs and necessary groundwater dewatering, compliance with the Stormwater General permit and Pierce County Right-of-Way permit, roadway excavation including removal and disposal of existing pavement and unwanted or excess materials encountered during execution of the project, coring an existing sanitary sewer manhole, traffic control, utility coordination, concrete curb ramp and sidewalk restoration, roadway restoration, and restoration of disturbed private property. The successful bidder will also be responsible for planning, coordinating, and implementing phased road closures as specified herein. The road closure for 160th Street E will require the Contractor to work six-12-hour workdays while the road is closed. Other road closures will require the Contractor to work a minimum of six-10-hour workdays during the road closure. If the Owner chooses to award the additive bid, the successful bidder will also be responsible for the installation of approximately 1,500 LF of traffic signal conduit and associated appurtenances

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents