Similar Projects
Bridge Sweeping to Clean and Remove Debris
Post-Bid
$100,000 est. value

Bridge Sweeping to Clean and Remove Debris
Post-Bid
$100,000 est. value

Bridge Sweeping to Clean and Remove Debris
Post-Bid
$100,000 est. value

Bridge Sweeping to Clean and Remove Debris
Post-Bid
$100,000 est. value

Bridge Sweeping to Clean and Remove Debris
Post-Bid
$100,000 est. value

Mechanical Sweeping Primary Roads
Post-Bid
$48,000 est. value
FL

Edging and Sweeping
Post-Bid
$100,000 est. value
FL

Routine Mechanized Road/Bridge Sweeping
Infrastructure
Results
$150,000 est. value

Routine Mechanized Road/Bridge Sweeping
Infrastructure
Results
$150,000 est. value

Routine Mechanized Road/Bridge Sweeping
Infrastructure
Results
$150,000 est. value

Routine Mechanized Road/Bridge Sweeping
Infrastructure
Results
$150,000 est. value

Routine Mechanized Road/Bridge Sweeping
Infrastructure
Results
$150,000 est. value

Routine Mechanized Road/Bridge Sweeping
Infrastructure
Post-Bid
$150,000 est. value
Sanderson, FL

Remove Built up Soil and Vegetation from the Outfall Ditches
Infrastructure
Results
$800,000 est. value

Remove Built up Soil and Vegetation from the Outfall Ditches
Infrastructure
Results
$800,000 est. value

Last Updated 05/12/2022 02:15 PM
Project Title

District Two Bridge Tending Services

Physical Address View project details and contacts
City, State (County) (Alachua, Baker, Bradford, Clay, Columbia, Dixie, Duval, Gilchrist, Hamilton, Lafayette, Levy, Madison, Nassau, Putnam, Saint Johns, Suwannee, Taylor, Union Counties)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Bridge of Lions is a twin leaf rolling bascule bridge. The draw spans are raised and lowered by two electric motors, and is also equipped with an emergency generator, used in case of commercial power failure The vertical clearance at the center of the draw span is 20 feet at mean high water, and the horizontal clearance is 76 feet. The bridge is unique, in that it is equipped with a traffic signal for the waterborne traffic as well as vehicular traffic

Details

Division 34 - Transportation, Operation and Maintenance of Transportation, Operation and Maintenance of Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents