Similar Projects
Last Updated | 12/20/2022 09:39 AM |
Project Title | Norrie Point Septic Improvements at Mills-Norrie State Park |
Physical Address | View project details and contacts |
City, State (County) | Staatsburg, NY 12580 (Dutchess County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Storage/Water Tanks |
Contracting Method | Competitive Bids |
Project Status | Construction Commenced, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $785,300 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All Requests for Information (RFIs) are due by Wednesday, October 26, 2022, by 4:00 PM. RFIs received after this date and time will not be processed. Decommissioning and demolishing in compliance with the applicable NYSDEC regulations existing pump station, septic tank and underground pipes. Inspection and repair, if necessary, parts of the existing wastewater treatment system to remain. Construction of new duplex pump station, septic tank, underground sewer gravity and force mains and two sections of raised absorption field. Provide complete and operational pump station electrical power and control systems. 1. The description of the Work in this section does not, and is not, intended to list every element of work but to provide guidance highlighting key elements of work that are included in scope of work. Read all Contract Documents thoroughly. Minority Owned Sub-Contracting Goal: 3% Women Owned Sub-Contracting Goal: 5% Service-Disabled Veteran-Owned Business Contracting Goal: 4% Contract term: 270 Days after contract approved by the NYS Comptroller's office. Each bid must be prepared and submitted in accordance with the Instructions to Bidders and must be accompanied by Bid Security in the form of a certified check, bank check, or bid bond in the amount of: General Construction Contract D005802 $34,600.00 Thirty-Four Thousand Six Hundred and 00/100 Dollars In accordance with State Finance Law, Section 139-j, the following agency staff have been designated as contacts for this contract: Oleg Koval, Asst. Engineer 845-889-3847 Shereen Sheikh, Administrative 518-450-9055 Tammy Murray, Administrative Michael Tesik, Asst. District Manager 518-474-3831 845-584786-2701 x 228 Please note that contacting any other agency staff regarding this contract may be a violation of State Finance Law, Section 139-j, resulting in a determination of contractor non-responsibility All Requests for Information (RFIs) are due by Wednesday, October 26, 2022, by 4:00 PM. RFIs received after this date and time will not be processed. RFIs shall be submitted to Oleg Koval via email: Oleg.Koval@parks.ny.gov The successful bidder will be required to furnish a Performance Bond and a Labor and Material Bond/Payment Bond in the statutory form of public bonds required by Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |