Similar Projects
Holly Acres Estates
Renovation, Alteration
Bidding
Erie, PA 16509

AMR Blacklick Creek Treatment Facility
Renovation
Bidding
$5,000,000 est. value
PA

Cleaning of Oil/Water Separators
Post-Bid
PA

Trc & Do Compliance Project
New Construction
Post-Bid
$95,000 est. value
Saegertown, PA 16433

WWTP Improvements - General Construction
Renovation
Results
$6,000,000 to $6,400,000 est. value
Bloomsburg, PA 17815

Wastewater Treatment Plant Upgrades Project - General/Mechanical Construction
Results
$36,900,000 to $43,000,000 est. value
New Castle, PA 16101

Wastewater Treatment Plant Improvements
Renovation
Construction
Pocono Lake, PA 18347

Indian Run Water Treatment Plant Upgrade - General Construction, Instrumentation and Controls/Electrical Construction
Construction
$1,300,000 est. value
Pottsville, PA

Zinc Orthophospate Storage and Feed System Replacement - General Construction
Renovation
Bidding
$3,000,000 to $4,000,000 est. value
Philadelphia, PA 19136

Water Treatment Improvements - General/Mechanical Construction
Post-Bid
Derry, PA

Water Renovation 20 Project - Water Treatment Plant - General / Mechanical
Results
Indiana, PA

Dubois Water Treatment Plant - Flocculator Replacement
Renovation
Bidding
$400,000 to $425,000 est. value
DuBois, PA

Water Treatment Plant Intake Upgrade Project
Renovation
Post-Bid
Columbia, PA 17512

Water Renovation 20 Project - Water Treatment Plant - Electrical (New Construction and Plant Upgrades)
Results
Indiana, PA

Cove Village Wastewater Treatment Plant Effluent Pump Station Upgrades
Renovation
Bidding
Zion Grove, PA 17985

Reported 01/19/2022 12:00 AM
Project Title

New Water Treatment Facility Project - General/Mechanical Work

Physical Address View project details and contacts
City, State (County) Claysburg, PA   (Blair County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Construction of a new modern masonry structure to house the equipment necessary for chemical dosing, chlorine residual monitoring, sampling, pump control, and data acquisition/telemetry. The work also includes the development of a new groundwater well and installation of the associated valve/metering vault. Approximately 2,500 LF of C900 PVC water piping (8"-24" dia.) will also be installed in the project area. Both the new treatment plant and well site are to be developed including all site work, access driveways, utility installation, and all other work necessary to facilitate the completion of the project.

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents