Similar Projects
Specialty Concrete Pads
Term Contract
Post-Bid
Knoxville, TN

Concrete Services for Blount County
Term Contract
Post-Bid
Maryville, TN 37804

Concrete Repair Using Hot Applied Fiber Reinforced Polymer Patching Material on S.R. 2 from west of Cowart Street (L.M. 7.4) to Rossville Boulevard (L.M. 8.5)
Results
Chattanooga, TN 37403

2021 Curb Cuts - Phase 2
Infrastructure, Alteration
Results
Knoxville, TN

Concrete
Term Contract
Post-Bid
Knoxville, TN

Concrete Work
Alteration
Results
Benton, TN

2021/2022 Concrete
Term Contract
Post-Bid
Cookeville, TN

Reinforced Concrete and Ductile Pipes
Term Contract
Results
Knoxville, TN

Harpeth River Concrete Steps
Alteration
Post-Bid
$50,000 est. value
Kingston Springs, TN 37082

Concrete Work at Fire Hall II Playground
Alteration
Results
Ashland City, TN

Concrete Project at Jackson County Middle and High School
Alteration
Post-Bid
Gainesboro, TN 38562

Kansas Pump Station Precast Concrete Structures
Alteration
Results
Talbott, TN 37877

Concrete Cutting Services
Term Contract
Post-Bid
Memphis, TN

Fall 2021 Concrete Replacement
Alteration
Results
$25,000 est. value
Bartlett, TN

Pre-Cast Concrete and Cast Iron Grates
Term Contract
Post-Bid
Knoxville, TN

Last Updated 12/30/2022 11:39 AM
Project Title

Eastbrook Greenbelt Trail Bank Stabilization

Physical Address View project details and contacts
City, State (County) Collierville, TN 38017   (Shelby County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $421,846 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work generally consists of the installation of permanent bank stabilization, and removal and replacement of the eroded walking trail and other work as called for in the contract documents as required for a completed project. Stabilizing the embankments and bed of the stream will be required with the installation of Armormax material and Scoulok units by Propex. Minor clearing may be required in order for the contractor to establish a working platform for the installation of bank stabilization. The WORK required under this CONTRACT includes furnishing and paying for all necessary materials, labor, tools, equipment and other items for construction improvements of the EASTBROOK GREENBELT TRAIL BANK STABILIZATION, complete in every detail, ready for the TOWN's beneficial use as specified herein and/or indicated on the CONTRACT drawings. The site is located within Cox Park and along the Eastbrook Greenbelt Trail, Collierville, TN. The PROJECT shall consist of, but is not limited to, the following items: 1. Clearing and Grubbing 2. Grading and Excavation 3. Trenching, Backfilling and Compaction 4. Other Related Items Liquidated Damages: $750 per day

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents