Similar Projects
Last Updated | 12/30/2022 11:39 AM |
Project Title | Eastbrook Greenbelt Trail Bank Stabilization |
Physical Address | View project details and contacts |
City, State (County) | Collierville, TN 38017 (Shelby County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $421,846 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of work generally consists of the installation of permanent bank stabilization, and removal and replacement of the eroded walking trail and other work as called for in the contract documents as required for a completed project. Stabilizing the embankments and bed of the stream will be required with the installation of Armormax material and Scoulok units by Propex. Minor clearing may be required in order for the contractor to establish a working platform for the installation of bank stabilization. The WORK required under this CONTRACT includes furnishing and paying for all necessary materials, labor, tools, equipment and other items for construction improvements of the EASTBROOK GREENBELT TRAIL BANK STABILIZATION, complete in every detail, ready for the TOWN's beneficial use as specified herein and/or indicated on the CONTRACT drawings. The site is located within Cox Park and along the Eastbrook Greenbelt Trail, Collierville, TN. The PROJECT shall consist of, but is not limited to, the following items: 1. Clearing and Grubbing 2. Grading and Excavation 3. Trenching, Backfilling and Compaction 4. Other Related Items Liquidated Damages: $750 per day |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |