Similar Projects
Install Emergency Cooling Tower Makeup Water
Design
$500,000 to $1,000,000 est. value
Cape Canaveral, FL 32925

Live Oak Drainage Wells Phase 1
Bidding
Less than $400,000 est. value
Live Oak, FL

Centrifugal Dewatering 12" x 8" Self-Priming Pumps - Trailer Mounted
Bidding
FL

LMI Milton Roy Metering Pump
Post-Bid
Tampa, FL 33602

SDWWTP Plug and Abandon FA Monitoring Wells and Install / Replacement of FA Wells
Post-Bid
Less than $3,810,945 est. value
Cutler Bay, FL 33190

South Hillsborough Aquifer Recharge Expansion
Results
$1,643,200 est. value
Tampa, FL 33600

N--Services: Replace Chilled Water Pumps (Service Only - Pumps/Motors Supplied)
Results
Miami, FL 33125

By-Pass Pumps Maintenance
Bidding
Davie, FL

Removal, Repair and Re-Installation of Two Vertical Single End Suction Axial Flow Pumps and Right-Angle Gear Drives
Post-Bid
Coral Springs, FL

Public Water Supply Well Construction
Results
Live Oak, FL 32064

Construction of Water Treatment Plant High Service Pumps
Bidding
$2,000,000 est. value
Lantana, FL 33462

Transfer Pump Replacement
Post-Bid
Less than $1,735,000 est. value
Hallandale, FL 33009

West Water Treatment Plant High Service Pumps MCC Replacement
Results
Less than $320,000 est. value
Deerfield Beach, FL 33441

Well No. 5 Replacement
New Construction
Bidding
Destin, FL

Barbee Towers Fire Pump Controller Installation
Post-Bid
Clearwater, FL 33756

Last Updated 02/19/2021 05:46 AM
Project Title

Purchase and Installation of a New Pump, Motor, and Drive

Physical Address View project details and contacts
City, State (County) Hudson, FL 34669   (Pasco County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor to install a new pump, motor and Variable Frequency Drive (VFD) on a new steel pallet with an eight inch (8”) suction line, which will have a commercial grade strainer submerged in the pond and connect to existing irrigation main lines. A new check valve will be installed, replacing existing electrical panel, and re-pump of the existing bladder tank.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents