Similar Projects
Water Plant Improvements - Water Well No. 4
Infrastructure
Bidding
Henderson, LA

Highway 1 South Well Field - Phase 2 - Site Work
Infrastructure
Bidding
$535,000 est. value
Alexandria, LA

Purchase of Chopper Pumps
Infrastructure
Post-Bid
Gretna, LA

Improvements to Causeway Boulevard and Scott Street Sewer Lift Station
New Construction, Infrastructure
Post-Bid
Gretna, LA

Chiller Pumps Replacement at the Municipal Auditorium
Infrastructure
Results
$38,500 est. value
Shreveport, LA

FLYGT Pump
Infrastructure
Results
Slidell, LA

Water Well No. 7
Infrastructure
Bidding
Breaux Bridge, LA

8-Inch Portable Water Pump
Infrastructure
Post-Bid
Convent, LA

Removal of Existing Vacuum Pumps and Furnish, Install and Startup of New Vacuum Pumps
Infrastructure
Results
Marrero, LA 70072

Highway 1 South Well Field Phase 2- Water Well
Infrastructure
Bidding
$465,000 est. value
Alexandria, LA

171 Tsurumi Pumps
Infrastructure
Post-Bid
Hahnville, LA

Vertical Turbine Solids Handling (VTSH) Pump and Motor
Infrastructure
Results
Gretna, LA

Construction of the Contract No. 3 Overton Ford Road New Water Well, Chlorination and Electrical
Infrastructure
Bidding
Ethel, LA

131 - Repair and/or Installation of Pumps and Related Equipment and Plant Maintenance
Infrastructure
Post-Bid
Hahnville, LA

Controller Pumps for Jefferson Parish Public Works Warehouse
Infrastructure
Results
Gretna, LA

Last Updated 10/15/2021 04:37 PM
Project Title

Install Two (2) New Submersible Grinder Pumps with Hose Elbow and Guide Rail Kit for the Jefferson Parish Recreation Department

Physical Address View project details and contacts
City, State (County) Gretna, LA   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents