Similar Projects
Pickleball Courts - Range Line Community Center - Mequon-Thiensville School District
New Construction, Infrastructure
Conception
$500,000 CJ est. value
Mequon, WI 53097

Western Road Mixed Use
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Cedarburg, WI 53012

KMC Stampings Industrial Building Addition
Addition, Demolition, Infrastructure
Design
$1,000,000 CJ est. value
Port Washington, WI 53074

Tamerlane Drive Lift Station O Pump Replacement
Renovation, Infrastructure
Bidding
$200,000 CJ est. value
Mequon, WI 53097

Tamerlane Drive Lift Station O Pump Replacement
Renovation, Infrastructure
Bidding
$200,000 CJ est. value
Mequon, WI 53097

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Cedarburg Lead Service Replacement Program
Infrastructure
Post-Bid
$500,000 est. value
Cedarburg, WI

Highland Road and I-43 Crossing
Infrastructure
Results
$721,680 est. value
Mequon, WI 53097

2022 Street Improvement Program
Infrastructure
Results
Grafton, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Fermentorium Expansion / Cedarburg
Addition, Demolition, Infrastructure - 9,000 SF
Pending Verification
$1,000,000 CJ est. value
Cedarburg, WI 53012

North Shore Bank Branch / Mequon
New Construction, Infrastructure - 3,250 SF
Pending Verification
$700,000 CJ est. value
Mequon, WI 53092

Woodside Prairie Supportive Housing
New Construction, Infrastructure - 36,650 SF
Design
$5,000,000 CJ est. value
Grafton, WI 53024

102-120 West Freistadt Road Building Demolition
Demolition, Alteration
Post-Bid
$25,000 est. value
Mequon, Thiensville, WI 53097

Last Updated 03/18/2023 03:34 AM
Project Title

Tamerlane Drive Lift Station "O" Parallel Force Main-Rebid

Physical Address View project details and contacts
City, State (County) Thiensville, WI 53097   (Ozaukee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $738,265 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Bid Received By & Opening Information: The City of Mequon, Wisconsin, by the undersigned Director of Public Works/City Engineer, will receive Bids for the Tamerlane Drive Lift Station "O" Parallel Force Main-Rebid via QuestCDN. Description: Tamerlane Drive Lift Station O Parallel Force Main. Project includes installation of parallel force main for Lift Station O, located at the intersection of Tamerlane Drive and Huntington Drive. BID SECURITY: A certified check, or satisfactory Bid Bond payable to the City of Mequon in the amount of not less than five (5%) percent of the Bid shall accompany each Bid as guarantee that if the Bid is accepted the Bidder will execute and file the Contract Performance Bond and Insurance Certificate as required by this contract within ten (10) calendar days after Notice of Award of the Contract by the City. BID REJECTION: The City reserves the right to reject any and all Bids, waive any informalities or irregularities in Bidding or accept any Bid or Bids which, in the opinion of the City, shall serve the City's best interest. BID WITHDRAWAL: No Bid may be withdrawn for a period of ninety (90) days after the time and date set for the opening thereof, without the consent of the City. BID WITHDRAWAL: No Bid may be withdrawn for a period of forty-five (45) days after the time and date set for the opening thereof, without the consent of the City.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents