Similar Projects
Latino Cultural Center - AR00000005 - City of Phoenix
New Construction, Renovation, Infrastructure
Conception
$902,484 CJ est. value
Phoenix, AZ 85004

Airport T-Hangar Buildings - 103970 - City of Buckeye
New Construction, Infrastructure - 10,080 SF
Conception
$3,572,600 CJ est. value
Buckeye, AZ 85326

Stream Data Center - Phoenix II-V/Phase 2-5
New Construction, Renovation, Infrastructure - 1,582,000 SF
Design
$150,000,000 CJ est. value
Goodyear, AZ 85338

Central and Thomas High Rise
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Phoenix, AZ 85012

Lehi Loop Shared Use Pathway - Phase 1
Infrastructure
Bidding
$6,000,000 CJ est. value
Mesa, AZ 85208

RFP - Development of P83 Central Business District
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Peoria, AZ 85345

RFQ Construction Manager at Risk - Site 20 New Reservoir Construction
Infrastructure
Post-Bid
$13,700,000 CJ est. value
Gilbert, AZ 85297

RFQ Design - Signal Butte Water Treatment Plant Expansion (SBWTP)
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$6,000,000 CJ est. value
Mesa, AZ 85212

Cattail Cove State Park- Construction of Water and Wastewater Treatment Systems
New Construction
Results
Phoenix, AZ 85085

City Elevator Upgrades South Tempe Water Treatment Plant (STWTP) and Johnny G. Martinez Water Treatment Plant (JGMWTP) Project
New Construction
Results
$442,860 est. value
Tempe, AZ 85281

5290 East Exeter Subdivision
New Construction
Construction
Phoenix, AZ 85018

Bungalows on Westgate - Glendale
New Construction, Infrastructure
Construction
Glendale, AZ 85305

Laveen Spectrum
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Phoenix, AZ 85041

Greenbelt 88 - Lucky Plaza
New Construction, Infrastructure - 22,000 SF
Pending Verification
$115,000,000 CJ est. value
Scottsdale, AZ 85251

Jomax Water Reclamation Facility Expansion - UT00388 - City of Peoria
Addition, Infrastructure
Conception
$65,499,546 CJ est. value
Peoria, AZ 85383

Last Updated 10/14/2022 10:36 AM
Project Title

RFQ Construction Manager at Risk - Cholla Water Treatment Plant 2023 Improvements

Physical Address View project details and contacts
City, State (County) Glendale, AZ 85304   (Maricopa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $19,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Cholla WTP is located at 4805 W. Cholla Street, Glendale, AZ. The current total project budget is approximately $19M, allocated over the next five years for repairs and improvements to the Cholla WTP. PROJECT DESCRIPTION The Cholla WTP began operations in 1978 and has a 30 MGD design capacity. The plant treats water from the Arizona Canal and supplies the treated water to the City's distribution system for Water Zones 1 and 2. There are six dual media filters, two 10-MG reservoirs (one on-site and one across the street from the plant) and a 6,000 (approx.) square foot administration building that consists of a lobby, control room, laboratory, instrument shop, conference room, offices, staff breakroom, staff locker/restrooms, and miscellaneous storage. Recently completed was the City's Integrated Water Master Plan (IWMP). To help normalize future plant improvement expenditures, as well as minimize the long construction phases required for catch-up rehabilitation efforts, the IWMP recommended regular plant assessments every five-years. The assessments will be used to identify process repairs and to prioritize improvements. An engineering firm will be contracted to evaluate the treatment processes and critical treatment components and make recommendations for prioritized plant improvements and operational procedures. After the evaluation phase is complete the selected engineering firm will develop design plans based on the evaluation recommendations. The selected CMAR will provide pre-construction management services during the WTP evaluation and design phases of the project and may serve as the general contractor during the various construction phases of the project. SCOPE OF WORK The City is seeking a qualified Construction Manager at Risk (CMAR) to provide pre-construction and construction services. The City will enter into a professional services agreement with an engineering firm for evaluation and design services. The CMAR will work closely with and be an integral part of the project team during all phases of this project. The CMAR begins with the firm in an agency support role for pre-construction services. At some point prior to construction, the CMAR will assume the risk of delivering the project through a guaranteed maximum price (GMP) contract. The CMAR will also be responsible for construction means and methods. Questions pertaining to the RFQ or selection process should be directed in writing to the Engineering Department, City of Glendale, 5850 West Glendale Avenue, Glendale, AZ 85301, or by email to EngineeringDept@glendaleaz.com.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents