Similar Projects
Construction of NAWS South Prairie Reservoir and Control Structure-General Construction
New Construction
Results
$14,600,000 est. value
Bismarck, ND

Pipestem Dam Spillway Modifications
Renovation, Term Contract
Post-Bid
$100,000,000 to $250,000,000 est. value
Jamestown, ND 58401

McDowell Dam Bank Stabilization 2021
Results
$106,000 est. value
Bismarck, ND

P--Bone Hill NWR - Dam Breach Construction
Renovation
Results
ND

Construction of NAWS South Prairie Reservoir and Control Structure - Combined General, Mechanical, Electrical and Reservoir Construction
New Construction
Results
$14,600,000 est. value
Bismarck, ND

Red River Structure - FMM Area Flood Risk Management
Post-Bid
$100,000,000 to $250,000,000 est. value
Fargo, ND

Construction of NAWS South Prairie Reservoir and Control Structure - 10.5 MG Wire-Wound Reservoir Construction
New Construction
Results
$14,600,000 est. value
Bismarck, ND

Construction of NAWS South Prairie Reservoir and Control Structure - Combined General, Mechanical and Electrical Construction
New Construction
Results
$14,600,000 est. value
Bismarck, ND

Jamestown Dam Outlet Works Stilling Basin Concrete Floor Repairs
Design
$500,000 to $1,000,000 est. value
Jamestown, ND

Reported 12/15/2021 12:00 AM
Project Title

Baldhill Dam Ogee Spillway Concrete Repair Project

Physical Address View project details and contacts
City, State (County) Valley City, ND 58072   (Barnes County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove all delaminated and unsound concrete, to a removal depth of sound concrete, along the downstream ogee spillway surfaces of gate bay(s) 1, 2, and 3. By methods of chemical grouting, eliminate all paths of water penetration into the structural concrete matrix. Water appears to be leaking through the exposed horizontal construction joints along the upstream vertical face and is existing to the downstream concrete ogee surface. Underwater chemical grouting will be required by an experienced dive team. The Contractor will be required to submit a diving safety plan for approval, including certifications for all divers. Divers will be required to seal the exterior vertical surface of each horizontal joint. A bituminous soaked oakum rope will be tightly packed into the horizontal joints to prevent any leakage of the chemical grout. Divers will also be used to drill and inject the chemical grout into the horizontal joints along the upstream piers. The contractor will be required to safely mix and inject the chemical grout into the concrete spillway structure in accordance with the manufacturer's recommendations and specified requirements.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents