Similar Projects
Road Widening and Reconstruction Poinciana Boulevard
Infrastructure
Design
FL

Sligh Boulevard and Columbia Street Improvements
Infrastructure
Bidding
$9,952,564 est. value
Orlando, FL 32806

SR 429 Widening from West Road to SR 414
Infrastructure
Bidding
Orlando, FL

Arrow and Message Boards
Term Contract
Post-Bid

Arrow and Message Boards
Term Contract
Post-Bid

Construction Manager at Risk Services Creative Village - Central Park and Roadway Improvements
Results
Less than $4,000,000 est. value
Orlando, FL 32802

Roadway Marking Materials
Results
Kissimmee, FL 34741

Buena Vista Drive North - Median Closure
Construction
Orlando, FL 32800

SheltAir FBO Parking Lot Expansion
Addition
Construction
Orlando, FL 32803

DMS Replacement Project - Phase 2
Infrastructure, Alteration
Bidding
Orlando, FL

Poitras East Master Infrastructure Phase 1B
Post-Bid
Orlando, FL

Road Improvements for Remington Community Development District
Results
$745,000 est. value
Orlando, FL 32801

Sign Repair and Installation Contractor Services
Term Contract, Infrastructure
Bidding
FL

Request for Qualifications for Construction Services
New Construction
Post-Bid
Orlando, FL 32811

Collector Roads Project
Results
Kissimmee, FL 34741

Last Updated 10/20/2021 06:16 AM
Project Title

Milling and Resurfacing Guardrail

Physical Address View project details and contacts
City, State (County) (Orange, Osceola Counties)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $17,928,893
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of providing all labor, materials, equipment and incidentals necessary for resurfacing and safety improvements along Daniel Webster Western Beltway (SR 429) from MP 0.0 to MP 11.0 in Osceola and Orange County. Roadway improvements include milling and resurfacing with cross slope correction and overbuild, guardrail and miscellaneous asphalt replacement, side slope repair, drainage inlet top replacement, concrete shoulder gutter replacement, and isolated area of reconstruction for crack remediation.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Roadway Construction, Vehicle Barriers, Impact Attenuating Devices.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents