Similar Projects
Ductile Iron Pipe
Term Contract
Bidding
Dallas, TX

Butterfly Valves Parts and Actuators Repair Services
Term Contract
Bidding
Dallas, TX

Advance Metering Infrastructure (AMI) Water Meters
Post-Bid
Glenn Heights, TX 75154

Water Pipeline Construction Project for Vitruvian Park Trinity Aquifer Well
Post-Bid
Addison, TX 75001

Utility Relocation for CSJ 0430-01-057 SH 352
Results
$264,313 est. value
Mesquite, TX 75149

River Oaks, Cameila and Fair Court Water Improvements
Results
$739,568 est. value
Irving, TX 75014

Internal Pipeline Cleaning
Term Contract
Bidding

Utilities Contractor for a Construction Project
Post-Bid
Irving, TX

A/R/C: Utility Repair and Replacement
Term Contract
Results
$150,000 est. value
Richardson, TX 75080

Water Main Replacement Project
Bidding
Farmers Branch, TX 75234

State Highway 161 Water Improvements
Post-Bid
Irving, TX 75038

Wilmer Water System Improvements Segment 1
Results
$1,911,078 est. value
Wilmer, TX 75172

The Mesa Water Distribution Improvements
Post-Bid
Glenn Heights, TX

Silverado Phase 3-MI, 4B-2 MI, 5-MI and Valley Storage Pond Water, Sanitary Sewer and Storm Drainage Improvements
Results
Dallas, TX

Snider Plaza Utility Replacement
Post-Bid
$5,300,000 to $6,000,000 est. value
University Park, TX

Last Updated 04/12/2021 04:34 PM
Project Title

Belt Line Road Valve Improvement at Plano Road and Yale Boulevard

Physical Address View project details and contacts
City, State (County) Richardson, TX 75080   (Dallas County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $487,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of existing (2) 20 inch, and (1) 14 inch gate valves; installation of new (3) 20 inch, (1) 14 inch, and (1) 8 inch resilient wedge gate valves and fittings, piping, welding, including line stopping; removal and replacement of 64 SY of 8 inch concrete pavement; trenching and trench safety; barricades, signage, and traffic control. Existing pipes are Reinforced Concrete Cylinder Pipe (RCCP).

Details

Division 33 - Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Distribution Valves.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents