Similar Projects
Kingdom Hall of Jehovah's Witnesses
New Construction, Infrastructure - 3,000 SF
Conception
$1,000,000 CJ est. value
Aurora, OH 44202

Prison Land Property Redevelopment
New Construction
Conception
$116,000,000 est. value
Lebanon, OH 45036

Subdivision In Broadview Heights
New Construction
Design
Broadview Heights, OH 44147

Deer Meadows Sanitary Sewer Improvements
New Construction
Design
$250,000 est. value
New Springfield, OH 44443

RFQ Contractor - Upper Arlington Community Center
New Construction, Infrastructure - 147,000 SF
Bidding
$55,000,000 CJ est. value
Upper Arlington, OH 43212

Market Survey DLA DSCC Water Line Renovation Project
Post-Bid
$1,000,000 to $5,000,000 est. value
Columbus, OH

Waterline Replacement
Post-Bid
Less than $138,700 est. value
Syracuse, OH 45779

Port Clinton Coastal Access Plan
New Construction
Results
$5,600,000 est. value
Port Clinton, OH 43452

Glyco II Forcemain Replacement - Contract A
Results
$1,622,193 est. value
Painesville, OH

Ashbury Avenue Townhomes
New Construction, Demolition
Construction
Cleveland, OH 44120

Texas Roadhouse - Site Development
New Construction - 7,462 SF
Construction
$750,000 est. value
Troy, OH 45373

Chick-fil-A #4826 / Columbus
Demolition, New Construction, Infrastructure - 5,141 SF
Pending Verification
$800,000 CJ est. value
Columbus, OH 43214

Towne Mall Galleria / Middletown Multi-Purpose Entertainment Venue
Demolition, New Construction, Infrastructure - 589,500 SF
Pending Verification
$280,000,000 CJ est. value
Middletown, OH 45005

Wyoga Lake Road Infrastructure & Apartment Building
New Construction - 2,000 SF
Design
Cuyahoga Falls, Stow, OH 44224

Streets and Water Materials and Services
Post-Bid
Wadsworth, OH

Last Updated 08/23/2022 08:33 AM
Project Title

Summit Street Storm Sewer Separation

Physical Address View project details and contacts
City, State (County) Defiance, OH 43512   (Defiance County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $46,800 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the removal and replacement of existing stormstructures, installation of approximately 63 lf of storm sewer, restoration andall necessary appurtenances. The opinion of probable construction costs is$43,220. Each bidder must beregistered as a plan holder with the City of Defiance Proposals must be submitted on the form furnished by the City; must containthe full name of every person interested therein and shall be accompanied by abid guarantee of a bond as required in Section 153.54 (A) of the Ohio RevisedCode with a satisfactory surety or accompanied by a bid guarantee of not lessthan per cent of the amount of the proposal by a Certified Check,Cashiers Check or letter of credit pursuant to Chapter 1305 and Section 153.54of the Ohio Revised Code on a solvent bank, subject to the conditions providedin the Notice to Bidders. Attention of bidders is particularly called to the requirements as to conditionof employment to be observed and minimum wage rates to be paid under thecontract. Any bid may be withdrawn prior to the scheduled closing time for receipt ofbids, but no bidder shall withdraw his bid within Sixty (60) days after the actualopening thereof. The right is reserved to reject any or all bids and to waive informalities.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents